HITCHLAND

Substation

Texas · TRI-COUNTY ELECTRIC COOP, INC

Max voltage
345
kV

At a glance

HITCHLAND is a 345 kV electric substation in Texas on TRI-COUNTY ELECTRIC COOP, INC's transmission network, recorded in the HIFLD transmission dataset. 12 transmission lines connect to it. 2 of Texas's 1,426 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is GRUVER in Hansford County, with a DC Readiness score of 60/100.

HITCHLAND is an electric transmission substation in Texas, on TRI-COUNTY ELECTRIC COOP, INC's transmission network. It is classified as high-voltage (345 kv) and connects 12 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines12

Ownership

Line owner (most lines)TRI-COUNTY ELECTRIC COOP, INC
StateTexas
Coordinates36.4963, -101.3917

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#158597345 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE29.7 mi
#158551345 kV—IN SERVICE118.3 mi
#310827345 kVRITA BLANCA ELECTRIC COOP, INCIN SERVICE102.8 mi
#158598345 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE29.6 mi
#312351115 kVSOUTHWESTERN PUBLIC SERVICE CO.IN SERVICE1.5 mi
#304412115 kVNORTH PLAINS ELECTRIC COOP INCIN SERVICE38.3 mi
#119544115 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE24.1 mi
#161563115 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE14.6 mi
#177084115 kVTRI-COUNTY ELECTRIC COOP, INCIN SERVICE8.8 mi
#303639115 kVNORTH PLAINS ELECTRIC COOP INCIN SERVICE6.9 mi
#15858969 kV—IN SERVICE12.1 mi
#158554—TRI-COUNTY ELECTRIC COOP, INCIN SERVICE0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HITCHLAND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HITCHLAND substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GRUVERSubstation-AdjacentTXHansford County345 kV600 MW3.5 yrs60.4
HITCHLANDSubstation-AdjacentTXHansford County345 kV600 MW3.5 yrs60.3
TAP307976Substation-AdjacentTXTexas County115 kV100 MW3.5 yrs57.1
UNKNOWN118708Substation-AdjacentOKTexas County115 kV100 MW4.3 yrs55.9
UNKNOWN118709Substation-AdjacentOKTexas County115 kV100 MW4.3 yrs55.8
TAP159614Substation-AdjacentOKTexas County115 kV100 MW4.3 yrs55.6
UNKNOWN118710Substation-AdjacentOKTexas County115 kV100 MW4.3 yrs55.6
UNKNOWN159617Substation-AdjacentOKTexas County115 kV100 MW4.3 yrs55.5

How does HITCHLAND compare with other substations in Texas?

Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 198 named substations in the state are in HITCHLAND's 345–499 kV band (14% of named stations). 2 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

Who owns the transmission lines at HITCHLAND?

The 12 connected lines listed above are owned by TRI-COUNTY ELECTRIC COOP, INC, RITA BLANCA ELECTRIC COOP, INC, SOUTHWESTERN PUBLIC SERVICE CO., NORTH PLAINS ELECTRIC COOP INC. Line voltages range from 69 kV to 345 kV. Their combined recorded length is about 387 miles.

How do candidate sites near HITCHLAND score?

The 8 highest-scoring candidate sites within about 25 miles range from 56 to 60 on the 0–100 DC Readiness scale. They fall in Hansford County, Texas County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is HITCHLAND substation?

HITCHLAND has a maximum voltage of 345 kV and a minimum of 115 kV. That places it in the 345–499 kV band. The median named US substation in this dataset is 115 kV, so HITCHLAND is above the national midpoint.

How many transmission lines connect to HITCHLAND substation?

12 transmission lines terminate at or pass through HITCHLAND in the HIFLD line data. The connected lines listed here run at 345 kV, 115 kV, 69 kV. Together the listed lines cover about 387 miles.

Who owns HITCHLAND substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at HITCHLAND belong to TRI-COUNTY ELECTRIC COOP, INC, and others to NORTH PLAINS ELECTRIC COOP INC, RITA BLANCA ELECTRIC COOP, INC, SOUTHWESTERN PUBLIC SERVICE CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is HITCHLAND substation located?

HITCHLAND is in Texas at 36.4963, -101.3917. The datacenter candidate sites closest to it are in Hansford County, Texas County.

Are there datacenter candidate sites near HITCHLAND substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of HITCHLAND. The highest-scoring is GRUVER at 60/100. Across Texas, the average DC Readiness score is 56.4.

Other 345 kV substations in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “HITCHLAND substation, Texas”, https://gridcensus.com/substations/texas/hitchland-e32dfbf2 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for HITCHLAND substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.