SOTEX5

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
345
kV

At a glance

SOTEX5 is a 345 kV electric substation in Texas on AEP TEXAS CENTRAL COMPANY's transmission network, recorded in the HIFLD transmission dataset. 15 transmission lines connect to it. 2 of Texas's 1,426 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is BLESSING in Matagorda County, with a DC Readiness score of 63/100.

SOTEX5 is an electric transmission substation in Texas, on AEP TEXAS CENTRAL COMPANY's transmission network. It is classified as high-voltage (345 kv) and connects 15 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage69 kV
Voltage classHigh-voltage (345 kV)
Connected lines15

Ownership

Line owner (most lines)AEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates28.7995, -96.0506

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#313503345 kV—IN SERVICE0.4 mi
#302550345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE140.2 mi
#303992345 kV—IN SERVICE138.7 mi
#305061345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE19.6 mi
#305441345 kVCENTERPOINT ENERGY—45.5 mi
#305994345 kVCENTERPOINT ENERGYIN SERVICE68.5 mi
#313501345 kV—IN SERVICE0.4 mi
#313502345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE0.4 mi
#308635345 kVCENTERPOINT ENERGY—45.4 mi
#309364345 kV—IN SERVICE13.4 mi
#312953345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE19.6 mi
#313500345 kV—IN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SOTEX5, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SOTEX5 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BLESSINGSubstation-AdjacentTXMatagorda County345 kV600 MW3.5 yrs63.0
SOTEX5Substation-AdjacentTXMatagorda County345 kV600 MW3.5 yrs63.0
HILLJESubstation-AdjacentTXWharton County345 kV600 MW3.5 yrs62.1
OZ WhartonGreenfieldTXWharton——3.5 yrs60.2
OZ BrazoriaGreenfieldTXBrazoria——3.5 yrs59.8
OZ MatagordaGreenfieldTXMatagorda——3.5 yrs58.7
UNKNOWN306386Substation-AdjacentTXBrazoria County138 kV100 MW3.5 yrs58.4
UNKNOWN310036Substation-AdjacentTXWharton County138 kV100 MW3.5 yrs58.0

How does SOTEX5 compare with other substations in Texas?

Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 198 named substations in the state are in SOTEX5's 345–499 kV band (14% of named stations). 2 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

Who owns the transmission lines at SOTEX5?

The 12 connected lines listed above are owned by AEP TEXAS CENTRAL COMPANY, CENTERPOINT ENERGY. Line voltages range from 345 kV to 345 kV. Their combined recorded length is about 492.4 miles.

How do candidate sites near SOTEX5 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 63 on the 0–100 DC Readiness scale. They fall in Matagorda County, Wharton County, Wharton, Brazoria. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is SOTEX5 substation?

SOTEX5 has a maximum voltage of 345 kV and a minimum of 69 kV. That places it in the 345–499 kV band. The median named US substation in this dataset is 115 kV, so SOTEX5 is above the national midpoint.

How many transmission lines connect to SOTEX5 substation?

15 transmission lines terminate at or pass through SOTEX5 in the HIFLD line data. The connected lines listed here run at 345 kV. Together the listed lines cover about 492.4 miles.

Who owns SOTEX5 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at SOTEX5 belong to AEP TEXAS CENTRAL COMPANY, and others to CENTERPOINT ENERGY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is SOTEX5 substation located?

SOTEX5 is in Texas at 28.7995, -96.0506. The datacenter candidate sites closest to it are in Matagorda County, Wharton County, Wharton.

Are there datacenter candidate sites near SOTEX5 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of SOTEX5. The highest-scoring is BLESSING at 63/100. Across Texas, the average DC Readiness score is 56.4.

Other 345 kV substations in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “SOTEX5 substation, Texas”, https://gridcensus.com/substations/texas/sotex5-8486566d (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for SOTEX5 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.