Skip to content
Gridcensus

CENTERVILLE SW

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
345
kV

At a glance

CENTERVILLE SW is a 345 kV electric substation in Texas on ONCOR ELECTRIC DELIVERY CO.'s transmission network, recorded in the HIFLD transmission dataset. 9 transmission lines connect to it. 2 of Texas's 1,426 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is WEST PLANO in Dallas County, with a DC Readiness score of 70/100.

CENTERVILLE SW is an electric transmission substation in Texas, on ONCOR ELECTRIC DELIVERY CO.'s transmission network. It is classified as high-voltage (345 kv) and connects 9 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage69 kV
Voltage classHigh-voltage (345 kV)
Connected lines9

Ownership

Line owner (most lines)ONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates32.8575, -96.6532

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#306250345 kVONCOR ELECTRIC DELIVERY CO.—1.3 mi
#308269345 kVFARMERS ELECTRIC COOP, INC - (TX)—14.9 mi
#304036138 kVONCOR ELECTRIC DELIVERY CO.—0.3 mi
#304337138 kVONCOR ELECTRIC DELIVERY CO.—3.0 mi
#302145138 kVONCOR ELECTRIC DELIVERY CO.—0.3 mi
#305020138 kVONCOR ELECTRIC DELIVERY CO.—3.0 mi
#308148138 kVONCOR ELECTRIC DELIVERY CO.—5.7 mi
#304568138 kVONCOR ELECTRIC DELIVERY CO.—0.3 mi
#302392138 kVONCOR ELECTRIC DELIVERY CO.—0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CENTERVILLE SW, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CENTERVILLE SW substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEST PLANOSubstation-AdjacentTXDallas County345 kV600 MW3.5 yrs70.1
LIGGETTSubstation-AdjacentTXDallas County345 kV600 MW3.5 yrs70.1
WEST LEVEESubstation-AdjacentTXDallas County345 kV600 MW3.5 yrs70.1
UNKNOWN306290Substation-AdjacentTXDallas County345 kV600 MW3.5 yrs70.0
ALLEN SWITCHINGSubstation-AdjacentTXCollin County345 kV600 MW3.5 yrs69.9
NORWOODSubstation-AdjacentTXDallas County345 kV600 MW3.5 yrs69.9
UNKNOWN300342Substation-AdjacentTXDallas County345 kV600 MW3.5 yrs69.9
UNKNOWN308812Substation-AdjacentTXCollin County345 kV600 MW3.5 yrs69.9

How does CENTERVILLE SW compare with other substations in Texas?

Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 198 named substations in the state are in CENTERVILLE SW's 345–499 kV band (14% of named stations). 2 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

Who owns the transmission lines at CENTERVILLE SW?

The 9 connected lines listed above are owned by ONCOR ELECTRIC DELIVERY CO., FARMERS ELECTRIC COOP, INC - (TX). Line voltages range from 138 kV to 345 kV. Their combined recorded length is about 29.2 miles.

How do candidate sites near CENTERVILLE SW score?

The 8 highest-scoring candidate sites within about 25 miles range from 70 to 70 on the 0–100 DC Readiness scale. They fall in Dallas County, Collin County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is CENTERVILLE SW substation?

CENTERVILLE SW has a maximum voltage of 345 kV and a minimum of 69 kV. That places it in the 345–499 kV band. The median named US substation in this dataset is 115 kV, so CENTERVILLE SW is above the national midpoint.

How many transmission lines connect to CENTERVILLE SW substation?

9 transmission lines terminate at or pass through CENTERVILLE SW in the HIFLD line data. The connected lines listed here run at 345 kV, 138 kV. Together the listed lines cover about 29.2 miles.

Who owns CENTERVILLE SW substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at CENTERVILLE SW belong to ONCOR ELECTRIC DELIVERY CO., and others to FARMERS ELECTRIC COOP, INC - (TX). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is CENTERVILLE SW substation located?

CENTERVILLE SW is in Texas at 32.8575, -96.6532. The datacenter candidate sites closest to it are in Dallas County, Collin County.

Are there datacenter candidate sites near CENTERVILLE SW substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of CENTERVILLE SW. The highest-scoring is WEST PLANO at 70/100. Across Texas, the average DC Readiness score is 56.4.

Other 345 kV substations in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “CENTERVILLE SW substation, Texas”, https://gridcensus.com/substations/texas/centerville-sw-0f2d809a (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for CENTERVILLE SW substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.