Farmers Electric Coop
Organization53 catalogued assets · 2 states
At a glance
Footprint
Where does Farmers Electric Coop have infrastructure?
Catalogued Farmers Electric Coop assets sit in New Mexico and Texas.
How large is Farmers Electric Coop's footprint compared with other organizations?
The highest-voltage Farmers Electric Coop substation in the catalog is rated 345 kV.
Candidate Sites Owned (1)
| Site | Location | DC Readiness | Candidate MW |
|---|---|---|---|
| EC Near ExxonMobil Hawkins Gas Plant | Wood, TX | 59.2/100 | — |
Substations (27)
| Substation | State | Max voltage | Connected lines |
|---|---|---|---|
| SARGENT ROAD | Texas | 345 kV | 8 |
| FORNEY SW | Texas | 345 kV | 8 |
| SEAGOVILLE SW | Texas | 345 kV | 5 |
| BEN DAVIS | Texas | 345 kV | 10 |
| WATERMILL | Texas | 345 kV | 13 |
| CENTERVILLE SW | Texas | 345 kV | 9 |
| ALLEN SWITCHING | Texas | 345 kV | 9 |
| ROYSE | Texas | 345 kV | 17 |
| LAKE HUBBARD | Texas | 138 kV | 9 |
| EAST MESQUITE | Texas | 138 kV | 4 |
| LAKE HUBBARD PUMP STATION | Texas | 138 kV | 0 |
| DUCK CREEK WASTEWATER TREATMENT PLANT | Texas | 138 kV | 0 |
| CRANDALL | Texas | 138 kV | 2 |
| TAP310745 | Texas | 138 kV | 3 |
| TAP302730 | Texas | 138 kV | 3 |
| TAP302500 | Texas | 138 kV | 3 |
| TAP305368 | Texas | 138 kV | 2 |
Showing 17 of 27 substations.
Transmission Lines (25)
| Line | State | Voltage | Length |
|---|---|---|---|
| Line #308269 | Texas | 345 kV | 14.9 mi |
| Line #308074 | Texas | 345 kV | 22.8 mi |
| Line #305454 | Texas | 345 kV | 22.8 mi |
| Line #309040 | Texas | 345 kV | 12.7 mi |
| Line #309178 | Texas | 345 kV | 16.9 mi |
| Line #310721 | Texas | 345 kV | 12.7 mi |
| Line #310262 | Texas | 138 kV | 9.4 mi |
| Line #301812 | Texas | 138 kV | 10.5 mi |
| Line #303868 | Texas | 138 kV | 8.2 mi |
| Line #308666 | Texas | 138 kV | 24.7 mi |
| Line #308942 | Texas | 138 kV | 5.5 mi |
| Line #312334 | Texas | 138 kV | 8.6 mi |
| Line #301100 | Texas | 138 kV | 7.5 mi |
| Line #302786 | New Mexico | 138 kV | 7.3 mi |
| Line #312055 | Texas | 138 kV | 6.0 mi |
| Line #313254 | New Mexico | 138 kV | 7.3 mi |
| Line #301096 | Texas | 138 kV | 1.6 mi |
| Line #308233 | Texas | 138 kV | 0.0 mi |
| Line #300417 | Texas | 138 kV | 0.1 mi |
| Line #308554 | Texas | 138 kV | 7.4 mi |
| Line #300416 | Texas | 138 kV | 5.2 mi |
| Line #301958 | Texas | 138 kV | 14.4 mi |
| Line #304119 | Texas | 138 kV | 5.3 mi |
| Line #311955 | Texas | 69 kV | 9.0 mi |
| Line #308724 | Texas | 69 kV | 3.5 mi |
Frequently asked questions
What infrastructure does Farmers Electric Coop own or operate?
GridCensus lists Farmers Electric Coop as the owner or operator of 1 candidate site, 27 substations and 25 transmission lines, located in New Mexico and Texas.
Does Farmers Electric Coop own land that could host a datacenter?
Farmers Electric Coop is the parcel owner of record for 1 scored datacenter candidate site, scoring up to 59.2/100 on the DC Readiness Score.
Organizations of similar size
Datacenter sites in Farmers Electric Coop's states
Is this your organization?
Claim the Farmers Electric Coop profile to correct asset details, add capacity and availability, and surface your footprint to site-selection teams using GridCensus.
Dataset updated . Screening estimates derived from public data sources.
Organization records are derived from public infrastructure datasets (EIA, HIFLD, FCC, PNNL, county parcels, PeeringDB) and may be incomplete or lag operational changes. Owner/operator names are normalized for grouping; counts and capacities are catalogued estimates. Confirm ownership and availability directly with the organization.
About this data
Source: Operator fields across GridCensus datacenter, internet-exchange and brownfield records, as published October 10, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Farmers Electric Coop infrastructure assets”, https://gridcensus.com/companies/farmers-electric-coop (data as of October 10, 2026).
Go deeper than the public screen
Every site and score for Farmers Electric Coop is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.