BEN DAVIS

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
345
kV

At a glance

BEN DAVIS is a 345 kV electric substation in Texas on ONCOR ELECTRIC DELIVERY CO.'s transmission network, recorded in the HIFLD transmission dataset. 10 transmission lines connect to it. 2 of Texas's 1,426 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is WEST PLANO in Dallas County, with a DC Readiness score of 70/100.

BEN DAVIS is an electric transmission substation in Texas, on ONCOR ELECTRIC DELIVERY CO.'s transmission network. It is classified as high-voltage (345 kv) and connects 10 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage14 kV
Voltage classHigh-voltage (345 kV)
Connected lines10

Ownership

Line owner (most lines)ONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates32.9578, -96.6121

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#309178345 kVFARMERS ELECTRIC COOP, INC - (TX)IN SERVICE16.9 mi
#311159345 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE6.9 mi
#303572138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE7.5 mi
#305296138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE2.6 mi
#305963138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE6.6 mi
#300193138 kVONCOR ELECTRIC DELIVERY CO.—1.6 mi
#310736138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE4.3 mi
#306239138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE12.1 mi
#300469138 kVONCOR ELECTRIC DELIVERY CO.—12.3 mi
#30727969 kVONCOR ELECTRIC DELIVERY CO.—6.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEN DAVIS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEN DAVIS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEST PLANOSubstation-AdjacentTXDallas County345 kV600 MW3.5 yrs70.1
WEST LEVEESubstation-AdjacentTXDallas County345 kV600 MW3.5 yrs70.1
UNKNOWN306290Substation-AdjacentTXDallas County345 kV600 MW3.5 yrs70.0
UNKNOWN300342Substation-AdjacentTXDallas County345 kV600 MW3.5 yrs69.9
ALLEN SWITCHINGSubstation-AdjacentTXCollin County345 kV600 MW3.5 yrs69.9
NORWOODSubstation-AdjacentTXDallas County345 kV600 MW3.5 yrs69.9
UNKNOWN308812Substation-AdjacentTXCollin County345 kV600 MW3.5 yrs69.9
UNKNOWN301639Substation-AdjacentTXDallas County345 kV600 MW3.5 yrs69.8

How does BEN DAVIS compare with other substations in Texas?

Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 198 named substations in the state are in BEN DAVIS's 345–499 kV band (14% of named stations). 2 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

Who owns the transmission lines at BEN DAVIS?

The 10 connected lines listed above are owned by FARMERS ELECTRIC COOP, INC - (TX), ONCOR ELECTRIC DELIVERY CO. Line voltages range from 69 kV to 345 kV. Their combined recorded length is about 77.3 miles.

How do candidate sites near BEN DAVIS score?

The 8 highest-scoring candidate sites within about 25 miles range from 70 to 70 on the 0–100 DC Readiness scale. They fall in Dallas County, Collin County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is BEN DAVIS substation?

BEN DAVIS has a maximum voltage of 345 kV and a minimum of 14 kV. That places it in the 345–499 kV band. The median named US substation in this dataset is 115 kV, so BEN DAVIS is above the national midpoint.

How many transmission lines connect to BEN DAVIS substation?

10 transmission lines terminate at or pass through BEN DAVIS in the HIFLD line data. The connected lines listed here run at 345 kV, 138 kV, 69 kV. Together the listed lines cover about 77.3 miles.

Who owns BEN DAVIS substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at BEN DAVIS belong to ONCOR ELECTRIC DELIVERY CO., and others to FARMERS ELECTRIC COOP, INC - (TX). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is BEN DAVIS substation located?

BEN DAVIS is in Texas at 32.9578, -96.6121. The datacenter candidate sites closest to it are in Dallas County, Collin County.

Are there datacenter candidate sites near BEN DAVIS substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of BEN DAVIS. The highest-scoring is WEST PLANO at 70/100. Across Texas, the average DC Readiness score is 56.4.

Other 345 kV substations in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “BEN DAVIS substation, Texas”, https://gridcensus.com/substations/texas/ben-davis-463570f3 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for BEN DAVIS substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.