Skip to content
Gridcensus

TAP162080

Substation

South Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
—
kV

At a glance

TAP162080 is an electric substation in South Carolina on DUKE ENERGY CAROLINAS, LLC's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN111316 in Cleveland County, with a DC Readiness score of 71/100.

TAP162080 is an electric transmission substation in South Carolina, on DUKE ENERGY CAROLINAS, LLC's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines1

Ownership

Line owner (most lines)DUKE ENERGY CAROLINAS, LLC
Coordinates35.0317, -81.5215

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#164143—DUKE ENERGY CAROLINAS, LLCIN SERVICE1.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP162080, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP162080 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111316Substation-AdjacentNCCleveland County500 kV1,000 MW5.3 yrs71.0
SediverBrownfieldSCYork County—520 MW3.9 yrs70.6
UNKNOWN133860Substation-AdjacentNCCherokee County230 kV300 MW5.3 yrs68.0
UNKNOWN111199Substation-AdjacentNCCleveland County500 kV1,000 MW5.3 yrs67.4
PEACH VALLEY TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.9 yrs65.9
RIPP SWITCHING STATIONSubstation-AdjacentSCCherokee County230 kV300 MW3.9 yrs65.0
PEACOCKSubstation-AdjacentNCGaston County230 kV300 MW5.3 yrs64.6
SHELBY TIESubstation-AdjacentNCCleveland County230 kV300 MW5.3 yrs64.2

Who owns the transmission lines at TAP162080?

The 1 connected line listed above is owned by DUKE ENERGY CAROLINAS, LLC. Their combined recorded length is about 1.1 miles.

How do candidate sites near TAP162080 score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 71 on the 0–100 DC Readiness scale. They fall in Cleveland County, York County, Cherokee County, Spartanburg County. The South Carolina average across 2,061 scored sites is 57.1. 1,124 of those South Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP162080 substation?

1 transmission line terminate at or pass through TAP162080 in the HIFLD line data. Together the listed lines cover about 1.1 miles.

Who owns TAP162080 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP162080 belong to DUKE ENERGY CAROLINAS, LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP162080 substation located?

TAP162080 is in South Carolina at 35.0317, -81.5215. The datacenter candidate sites closest to it are in Cleveland County, York County, Cherokee County.

Are there datacenter candidate sites near TAP162080 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP162080. The highest-scoring is UNKNOWN111316 at 71/100. Across South Carolina, the average DC Readiness score is 57.1.

More in South Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP162080 substation, South Carolina”, https://gridcensus.com/substations/south-carolina/tap162080-ab496469 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP162080 substation, South Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.