Skip to content
Gridcensus

TAP150707

Substation

South Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
69
kV

At a glance

TAP150707 is a 69 kV electric substation in South Carolina on PROGRESS ENERGY CAROLINAS INC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN117825 in Calhoun County, with a DC Readiness score of 64/100.

TAP150707 is an electric transmission substation in South Carolina, on PROGRESS ENERGY CAROLINAS INC's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)PROGRESS ENERGY CAROLINAS INC
Coordinates33.9584, -80.4283

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#12740769 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.0 mi
#14086069 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE2.1 mi
#17207669 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE2.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP150707, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP150707 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117825Substation-AdjacentSCCalhoun County230 kV300 MW3.9 yrs64.4
UNKNOWN120940Substation-AdjacentSCKershaw County230 kV300 MW3.9 yrs63.3
UNKNOWN120939Substation-AdjacentSCKershaw County230 kV300 MW3.9 yrs63.0
TAP170187Substation-AdjacentSCLee County230 kV300 MW3.9 yrs62.4
UNKNOWN120864Substation-AdjacentSCSumter County230 kV300 MW3.9 yrs62.2
TAP142288Substation-AdjacentSCClarendon County230 kV300 MW3.9 yrs62.2
UNKNOWN120918Substation-AdjacentSCSumter County230 kV300 MW3.9 yrs62.1
UNKNOWN120919Substation-AdjacentSCClarendon County230 kV300 MW3.9 yrs62.0

Who owns the transmission lines at TAP150707?

The 3 connected lines listed above are owned by DUKE ENERGY PROGRESS - (NC), PROGRESS ENERGY CAROLINAS INC. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 4.3 miles.

How do candidate sites near TAP150707 score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 64 on the 0–100 DC Readiness scale. They fall in Calhoun County, Kershaw County, Lee County, Sumter County. The South Carolina average across 2,061 scored sites is 57.1. 1,124 of those South Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP150707 substation?

TAP150707 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP150707 is below the national midpoint.

How many transmission lines connect to TAP150707 substation?

3 transmission lines terminate at or pass through TAP150707 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 4.3 miles.

Who owns TAP150707 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP150707 belong to PROGRESS ENERGY CAROLINAS INC, and others to DUKE ENERGY PROGRESS - (NC). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP150707 substation located?

TAP150707 is in South Carolina at 33.9584, -80.4283. The datacenter candidate sites closest to it are in Calhoun County, Kershaw County, Lee County.

Are there datacenter candidate sites near TAP150707 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP150707. The highest-scoring is UNKNOWN117825 at 64/100. Across South Carolina, the average DC Readiness score is 57.1.

More in South Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP150707 substation, South Carolina”, https://gridcensus.com/substations/south-carolina/tap150707-68ff3c02 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP150707 substation, South Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.