TAP169658

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

At a glance

TAP169658 is a 115 kV electric substation in North Carolina on PROGRESS ENERGY CAROLINAS INC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is CUMBERLAND in Cumberland County, with a DC Readiness score of 66/100.

TAP169658 is an electric transmission substation in North Carolina, on PROGRESS ENERGY CAROLINAS INC's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)PROGRESS ENERGY CAROLINAS INC
Coordinates35.1887, -78.7176

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#167730115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.8 mi
#171429115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.1 mi
#171430115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP169658, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP169658 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CUMBERLANDSubstation-AdjacentNCCumberland County500 kV1,000 MW5.3 yrs65.8
UNKNOWN115253Substation-AdjacentNCHarnett County230 kV300 MW5.3 yrs63.8
UNKNOWN115252Substation-AdjacentNCHarnett County230 kV300 MW5.3 yrs63.7
UNKNOWN113511Substation-AdjacentNCJohnston County230 kV300 MW5.3 yrs63.5
UNKNOWN113996Substation-AdjacentNCHarnett County230 kV300 MW5.3 yrs62.3
UNKNOWN113507Substation-AdjacentNCJohnston County230 kV300 MW5.3 yrs62.2
UNKNOWN113506Substation-AdjacentNCJohnston County230 kV300 MW5.3 yrs62.2
TAP147989Substation-AdjacentNCJohnston County230 kV300 MW5.3 yrs62.1

Who owns the transmission lines at TAP169658?

The 3 connected lines listed above are owned by PROGRESS ENERGY CAROLINAS INC, DUKE ENERGY PROGRESS - (NC). Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 9.8 miles.

How do candidate sites near TAP169658 score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 66 on the 0–100 DC Readiness scale. They fall in Cumberland County, Harnett County, Johnston County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP169658 substation?

TAP169658 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP169658 is at the national midpoint.

How many transmission lines connect to TAP169658 substation?

3 transmission lines terminate at or pass through TAP169658 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 9.8 miles.

Who owns TAP169658 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP169658 belong to PROGRESS ENERGY CAROLINAS INC, and others to DUKE ENERGY PROGRESS - (NC). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP169658 substation located?

TAP169658 is in North Carolina at 35.1887, -78.7176. The datacenter candidate sites closest to it are in Cumberland County, Harnett County, Johnston County.

Are there datacenter candidate sites near TAP169658 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP169658. The highest-scoring is CUMBERLAND at 66/100. Across North Carolina, the average DC Readiness score is 55.1.

More in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP169658 substation, North Carolina”, https://gridcensus.com/substations/north-carolina/tap169658-3655c811 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP169658 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.