TAP169644

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
66
kV

At a glance

TAP169644 is a 66 kV electric substation in North Carolina on PROGRESS ENERGY CAROLINAS INC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is CUMBERLAND in Cumberland County, with a DC Readiness score of 66/100.

TAP169644 is an electric transmission substation in North Carolina, on PROGRESS ENERGY CAROLINAS INC's transmission network. It is classified as distribution (<69 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage66 kV
Min voltage66 kV
Voltage classDistribution (<69 kV)
Connected lines3

Ownership

Line owner (most lines)PROGRESS ENERGY CAROLINAS INC
Coordinates35.0625, -79.0109

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16801566 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE1.1 mi
#17141166 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE2.0 mi
#17141266 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP169644, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP169644 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CUMBERLANDSubstation-AdjacentNCCumberland County500 kV1,000 MW5.3 yrs65.8
FAYETTEVILLESubstation-AdjacentNCCumberland County230 kV300 MW5.3 yrs61.8
UNKNOWN114113Substation-AdjacentNCCumberland County230 kV300 MW5.3 yrs61.8
FAYETTEVILLE EASTSubstation-AdjacentNCCumberland County230 kV300 MW5.3 yrs61.8
WOODRUFF STREETSubstation-AdjacentNCCumberland County230 kV300 MW5.3 yrs61.8
RAEFORDSubstation-AdjacentNCHoke County230 kV300 MW5.3 yrs61.7
TAP147222Substation-AdjacentNCHoke County230 kV300 MW5.3 yrs61.7
UNKNOWN114104Substation-AdjacentNCCumberland County230 kV300 MW5.3 yrs61.7

Who owns the transmission lines at TAP169644?

The 3 connected lines listed above are owned by PROGRESS ENERGY CAROLINAS INC, DUKE ENERGY PROGRESS - (NC). Line voltages range from 66 kV to 66 kV. Their combined recorded length is about 3.9 miles.

How do candidate sites near TAP169644 score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 66 on the 0–100 DC Readiness scale. They fall in Cumberland County, Hoke County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP169644 substation?

TAP169644 has a maximum voltage of 66 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so TAP169644 is below the national midpoint.

How many transmission lines connect to TAP169644 substation?

3 transmission lines terminate at or pass through TAP169644 in the HIFLD line data. The connected lines listed here run at 66 kV. Together the listed lines cover about 3.9 miles.

Who owns TAP169644 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP169644 belong to PROGRESS ENERGY CAROLINAS INC, and others to DUKE ENERGY PROGRESS - (NC). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP169644 substation located?

TAP169644 is in North Carolina at 35.0625, -79.0109. The datacenter candidate sites closest to it are in Cumberland County, Hoke County.

Are there datacenter candidate sites near TAP169644 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP169644. The highest-scoring is CUMBERLAND at 66/100. Across North Carolina, the average DC Readiness score is 55.1.

More in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP169644 substation, North Carolina”, https://gridcensus.com/substations/north-carolina/tap169644-82ea1e76 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP169644 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.