At a glance

MOREHEAD WILDWOOD is a 230 kV electric substation in North Carolina on PROGRESS ENERGY CAROLINAS INC's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 10 of North Carolina's 106 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN111435 in Craven County, with a DC Readiness score of 61/100.

MOREHEAD WILDWOOD is an electric transmission substation in North Carolina, on PROGRESS ENERGY CAROLINAS INC's transmission network. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership

Line owner (most lines)PROGRESS ENERGY CAROLINAS INC
Coordinates34.7482, -76.8033

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#147108230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE15.4 mi
#108399115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE3.4 mi
#139120115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.1 mi
#120853—PROGRESS ENERGY CAROLINAS INCIN SERVICE3.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MOREHEAD WILDWOOD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MOREHEAD WILDWOOD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111435Substation-AdjacentNCCraven County230 kV300 MW5.3 yrs61.0
NEW BERNSubstation-AdjacentNCCraven County230 kV300 MW5.3 yrs61.0
TAP148457Substation-AdjacentNCCraven County230 kV300 MW5.3 yrs60.9
UNKNOWN111442Substation-AdjacentNCCraven County230 kV300 MW5.3 yrs60.9
UNKNOWN111638Substation-AdjacentNCJones County230 kV300 MW5.3 yrs60.3
MOREHEAD WILDWOODSubstation-AdjacentNCCarteret County230 kV300 MW5.3 yrs59.3
TAP148459Substation-AdjacentNCPamlico County230 kV300 MW5.3 yrs58.3
OZ CravenGreenfieldNCCraven——5.3 yrs57.8

How does MOREHEAD WILDWOOD compare with other substations in North Carolina?

North Carolina has 3,209 substation records in HIFLD, of which 106 carry a station name; the rest are unnamed tap points, risers and line ends. 54 named substations in the state are in MOREHEAD WILDWOOD's 230–344 kV band (51% of named stations). 10 sit in a higher band. 10 named substations in North Carolina operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 230 kV.

Who owns the transmission lines at MOREHEAD WILDWOOD?

The 4 connected lines listed above are owned by PROGRESS ENERGY CAROLINAS INC. Line voltages range from 115 kV to 230 kV. Their combined recorded length is about 22.2 miles.

How do candidate sites near MOREHEAD WILDWOOD score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 61 on the 0–100 DC Readiness scale. They fall in Craven County, Jones County, Carteret County, Pamlico County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is MOREHEAD WILDWOOD substation?

MOREHEAD WILDWOOD has a maximum voltage of 230 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so MOREHEAD WILDWOOD is above the national midpoint.

How many transmission lines connect to MOREHEAD WILDWOOD substation?

4 transmission lines terminate at or pass through MOREHEAD WILDWOOD in the HIFLD line data. The connected lines listed here run at 230 kV, 115 kV. Together the listed lines cover about 22.2 miles.

Who owns MOREHEAD WILDWOOD substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at MOREHEAD WILDWOOD belong to PROGRESS ENERGY CAROLINAS INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is MOREHEAD WILDWOOD substation located?

MOREHEAD WILDWOOD is in North Carolina at 34.7482, -76.8033. The datacenter candidate sites closest to it are in Craven County, Jones County, Carteret County.

Are there datacenter candidate sites near MOREHEAD WILDWOOD substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of MOREHEAD WILDWOOD. The highest-scoring is UNKNOWN111435 at 61/100. Across North Carolina, the average DC Readiness score is 55.1.

Other 230 kV substations in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “MOREHEAD WILDWOOD substation, North Carolina”, https://gridcensus.com/substations/north-carolina/morehead-wildwood-6f278c09 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for MOREHEAD WILDWOOD substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.