Skip to content
Gridcensus

CLINTON

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
230
kV

At a glance

CLINTON is a 230 kV electric substation in North Carolina on PROGRESS ENERGY CAROLINAS INC's transmission network, recorded in the HIFLD transmission dataset. 6 transmission lines connect to it. 10 of North Carolina's 106 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is LEE in Wayne County, with a DC Readiness score of 65/100.

CLINTON is an electric transmission substation in North Carolina, on PROGRESS ENERGY CAROLINAS INC's transmission network. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership

Line owner (most lines)PROGRESS ENERGY CAROLINAS INC
Coordinates35.0584, -78.2798

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#109268230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE14.7 mi
#138584230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE15.1 mi
#100155115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.2 mi
#113370115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE4.0 mi
#123684115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE4.1 mi
#135037115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE12.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CLINTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CLINTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LEESubstation-AdjacentNCWayne County230 kV300 MW5.3 yrs64.5
UNKNOWN113507Substation-AdjacentNCJohnston County230 kV300 MW5.3 yrs62.2
UNKNOWN113506Substation-AdjacentNCJohnston County230 kV300 MW5.3 yrs62.2
CLINTONSubstation-AdjacentNCSampson County230 kV300 MW5.3 yrs61.7
TAP147163Substation-AdjacentNCHarnett County230 kV300 MW5.3 yrs61.5
ERWINSubstation-AdjacentNCHarnett County230 kV300 MW5.3 yrs61.3
UNKNOWN112765Substation-AdjacentNCSampson County230 kV300 MW5.3 yrs61.1
TAP147987Substation-AdjacentNCSampson County230 kV300 MW5.3 yrs61.1

How does CLINTON compare with other substations in North Carolina?

North Carolina has 3,209 substation records in HIFLD, of which 106 carry a station name; the rest are unnamed tap points, risers and line ends. 54 named substations in the state are in CLINTON's 230–344 kV band (51% of named stations). 10 sit in a higher band. 10 named substations in North Carolina operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 230 kV.

Who owns the transmission lines at CLINTON?

The 6 connected lines listed above are owned by PROGRESS ENERGY CAROLINAS INC. Line voltages range from 115 kV to 230 kV. Their combined recorded length is about 56.7 miles.

How do candidate sites near CLINTON score?

The 8 highest-scoring candidate sites within about 25 miles range from 61 to 65 on the 0–100 DC Readiness scale. They fall in Wayne County, Johnston County, Sampson County, Harnett County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is CLINTON substation?

CLINTON has a maximum voltage of 230 kV and a minimum of 115 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so CLINTON is above the national midpoint.

How many transmission lines connect to CLINTON substation?

6 transmission lines terminate at or pass through CLINTON in the HIFLD line data. The connected lines listed here run at 230 kV, 115 kV. Together the listed lines cover about 56.7 miles.

Who owns CLINTON substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at CLINTON belong to PROGRESS ENERGY CAROLINAS INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is CLINTON substation located?

CLINTON is in North Carolina at 35.0584, -78.2798. The datacenter candidate sites closest to it are in Wayne County, Johnston County, Sampson County.

Are there datacenter candidate sites near CLINTON substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of CLINTON. The highest-scoring is LEE at 65/100. Across North Carolina, the average DC Readiness score is 55.1.

Other 230 kV substations in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “CLINTON substation, North Carolina”, https://gridcensus.com/substations/north-carolina/clinton-8bb4f4ab (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for CLINTON substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.