TAP135907
SubstationNew York
TAP135907 is an electric transmission substation in New York. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP135907, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN135915 | Substation-Adjacent | CT | Southeastern Connecticut Planning Region | 345 kV | 600 MW | 4.3 yrs | 68.6 |
| UNKNOWN136510 | Substation-Adjacent | CT | Southeastern Connecticut Planning Region | 115 kV | 100 MW | 4.3 yrs | 62.0 |
| UNKNOWN158612 | Substation-Adjacent | CT | Lower Connecticut River Valley Planning Region | 115 kV | 100 MW | 4.3 yrs | 61.2 |
| BOKUM | Substation-Adjacent | CT | Lower Connecticut River Valley Planning Region | 115 kV | 100 MW | 4.3 yrs | 61.2 |
| GREEN HILL | Substation-Adjacent | CT | Lower Connecticut River Valley Planning Region | 115 kV | 100 MW | 4.3 yrs | 60.9 |
| 170 and 172 Howard Street | Industrial | CT | Southeastern Connecticut County | — | — | 4.3 yrs | 57.6 |
| Parcel J | Industrial | CT | Southeastern Connecticut County | — | — | 4.3 yrs | 57.6 |
| Parcel 5C1 | Industrial | CT | Southeastern Connecticut County | — | — | 4.3 yrs | 57.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP135907 substation, New York is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.