BOKUM
Substation-AdjacentLower Connecticut River Valley Planning Region, Connecticut · ISO-NE
BOKUM is a substation-adjacent datacenter candidate site in Lower Connecticut River Valley Planning Region, Connecticut, interconnecting through ISO-NE. It screens at 58.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on computer & data processing equipment.
Site location
Get alerts
Track BOKUM
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Lower Connecticut River Valley Planning Region, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| NO. WALL | Substation-Adjacent | 345 kV | 600 MW | 3.9 yrs | 65.8 |
| KLEEN | Substation-Adjacent | 345 kV | 600 MW | 3.9 yrs | 65.2 |
| SCOVILL ROCK | Substation-Adjacent | 345 kV | 600 MW | 3.9 yrs | 64.8 |
| HADDAM NECK | Substation-Adjacent | 345 kV | 600 MW | 3.9 yrs | 63.7 |
| HADDAM | Substation-Adjacent | 345 kV | 600 MW | 3.9 yrs | 63.6 |
| MIDDLETOWN | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 60.7 |
| WEST SIDE | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 59.2 |
| PORTLAND | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 59.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for BOKUM, Lower Connecticut River Valley Planning Region. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.