ARTESIA SOUTH

Substation

New Mexico

Max voltage
69
kV

At a glance

ARTESIA SOUTH is a 69 kV electric substation in New Mexico, recorded in the HIFLD transmission dataset. 0 transmission lines connect to it. 282 of New Mexico's 387 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN307140 in Eddy County, with a DC Readiness score of 58/100.

ARTESIA SOUTH is an electric transmission substation in New Mexico. It is classified as distribution (69–115 kv) and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines0

Ownership

No owner is recorded for the lines that connect here.

Coordinates32.7992, -104.3952

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ARTESIA SOUTH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ARTESIA SOUTH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN307140Substation-AdjacentNMEddy County345 kV600 MW4.3 yrs58.2
EDDY AC-DC-AC TIESubstation-AdjacentNMEddy County345 kV600 MW4.3 yrs57.6
UNKNOWN306969Substation-AdjacentNMEddy County230 kV300 MW4.3 yrs56.5
UNKNOWN305514Substation-AdjacentNMEddy County230 kV300 MW4.3 yrs56.0
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs54.9
EC FFE Eddy CountyGreenfieldNMEddy County——4.3 yrs54.7
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs54.3
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs54.1

How does ARTESIA SOUTH compare with other substations in New Mexico?

New Mexico has 619 substation records in HIFLD, of which 387 carry a station name; the rest are unnamed tap points, risers and line ends. 88 named substations in the state are in ARTESIA SOUTH's 69–114 kV band (23% of named stations). 282 sit in a higher band. 24 named substations in New Mexico operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

How do candidate sites near ARTESIA SOUTH score?

The 8 highest-scoring candidate sites within about 25 miles range from 54 to 58 on the 0–100 DC Readiness scale. They fall in Eddy County, Eddy. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is ARTESIA SOUTH substation?

ARTESIA SOUTH has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so ARTESIA SOUTH is below the national midpoint.

How many transmission lines connect to ARTESIA SOUTH substation?

0 transmission lines terminate at or pass through ARTESIA SOUTH in the HIFLD line data.

Where is ARTESIA SOUTH substation located?

ARTESIA SOUTH is in New Mexico at 32.7992, -104.3952. The datacenter candidate sites closest to it are in Eddy County, Eddy.

Are there datacenter candidate sites near ARTESIA SOUTH substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of ARTESIA SOUTH. The highest-scoring is UNKNOWN307140 at 58/100. Across New Mexico, the average DC Readiness score is 47.8.

Other 69 kV substations in New Mexico

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “ARTESIA SOUTH substation, New Mexico”, https://gridcensus.com/substations/new-mexico/artesia-south-909cf0f7 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for ARTESIA SOUTH substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.