EDDY AC-DC-AC TIE

Substation-Adjacent

Eddy County, New Mexico · SPP

DC Readiness
52.3
Fair / 100

EDDY AC-DC-AC TIE is a substation-adjacent datacenter candidate site in Eddy County, New Mexico, interconnecting through SPP. It screens at 52.3/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationEDDY AC-DC-AC TIE
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionSPP
Queue depth14
Avg queue wait3.3 yrs

Connectivity

Nearest IXPMDC El Paso
IXP distance141.5 mi
Fiber providers4
Fiber coverage48.7%

Site characteristics

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterDatacenter 1511639842
DC distance92.1 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity13.30¢/kWh
Industrial electricity8.44¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$907

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
44
Fiber connectivity12%
28
Energy cost10%
50
Water risk8%
20
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Eddy County, ranked by DC Readiness.

Sites near EDDY AC-DC-AC TIE
SiteTypeVoltageCapacityQueue waitScore
EC Near CarlsbadGreenfield3.5 yrs55.6
OZ EddyGreenfield3.5 yrs55.3
EC Near CarlsbadGreenfield3.5 yrs55.0
EC Near CarlsbadGreenfield3.5 yrs54.9
EC Near CarlsbadGreenfield3.5 yrs54.4
EC FFE Eddy CountyGreenfield3.5 yrs54.3
EC Near CarlsbadGreenfield3.5 yrs53.8
EC Near CarlsbadGreenfield3.5 yrs53.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.