TURLEY SWITCHING STATION is a 69 kV electric substation in New Mexico on FARMINGTON ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. 282 of New Mexico's 387 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is OZ La Plata in La Plata, with a DC Readiness score of 53/100.

TURLEY SWITCHING STATION is an electric transmission substation in New Mexico, on FARMINGTON ELECTRIC COMPANY's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)FARMINGTON ELECTRIC COMPANY
Coordinates36.7389, -107.8004

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#305679115 kVJEMEZ MOUNTAIN ELECTRIC COOPERATIVEIN SERVICE0.0 mi
#30004069 kV——10.0 mi
#30785369 kVFARMINGTON ELECTRIC COMPANYIN SERVICE21.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TURLEY SWITCHING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TURLEY SWITCHING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ La PlataGreenfieldCOLa Plata——4.3 yrs53.3
Blanco Compressor StationBrownfieldNMSan Juan County115 kV3 MW3.5 yrs53.0
UNKNOWN203904Substation-AdjacentCOLa Plata County115 kV100 MW4.3 yrs52.6
UNKNOWN209750Substation-AdjacentCOLa Plata County115 kV100 MW4.3 yrs52.0
TAP203980Substation-AdjacentCOLa Plata County115 kV100 MW4.3 yrs51.8
UNKNOWN205932Substation-AdjacentCOLa Plata County115 kV100 MW4.3 yrs51.8
UNKNOWN204023Substation-AdjacentCOLa Plata County115 kV100 MW4.3 yrs51.7
EC Coal San Juan CountyGreenfieldNMSan Juan County——3.5 yrs51.2

How does TURLEY SWITCHING STATION compare with other substations in New Mexico?

New Mexico has 619 substation records in HIFLD, of which 387 carry a station name; the rest are unnamed tap points, risers and line ends. 88 named substations in the state are in TURLEY SWITCHING STATION's 69–114 kV band (23% of named stations). 282 sit in a higher band. 24 named substations in New Mexico operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

Who owns the transmission lines at TURLEY SWITCHING STATION?

The 3 connected lines listed above are owned by JEMEZ MOUNTAIN ELECTRIC COOPERATIVE, FARMINGTON ELECTRIC COMPANY. Line voltages range from 69 kV to 115 kV. Their combined recorded length is about 31.2 miles.

How do candidate sites near TURLEY SWITCHING STATION score?

The 8 highest-scoring candidate sites within about 25 miles range from 51 to 53 on the 0–100 DC Readiness scale. They fall in La Plata, San Juan County, La Plata County. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TURLEY SWITCHING STATION substation?

TURLEY SWITCHING STATION has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TURLEY SWITCHING STATION is below the national midpoint.

How many transmission lines connect to TURLEY SWITCHING STATION substation?

3 transmission lines terminate at or pass through TURLEY SWITCHING STATION in the HIFLD line data. The connected lines listed here run at 115 kV, 69 kV. Together the listed lines cover about 31.2 miles.

Who owns TURLEY SWITCHING STATION substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TURLEY SWITCHING STATION belong to FARMINGTON ELECTRIC COMPANY, and others to JEMEZ MOUNTAIN ELECTRIC COOPERATIVE. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TURLEY SWITCHING STATION substation located?

TURLEY SWITCHING STATION is in New Mexico at 36.7389, -107.8004. The datacenter candidate sites closest to it are in La Plata, San Juan County, La Plata County.

Are there datacenter candidate sites near TURLEY SWITCHING STATION substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TURLEY SWITCHING STATION. The highest-scoring is OZ La Plata at 53/100. Across New Mexico, the average DC Readiness score is 47.8.

Other 69 kV substations in New Mexico

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TURLEY SWITCHING STATION substation, New Mexico”, https://gridcensus.com/substations/new-mexico/turley-switching-station-8e7968b3 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TURLEY SWITCHING STATION substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.