Skip to content
Gridcensus

TAP171638

Substation

New Jersey · ATLANTIC CITY ELECTRIC CO

Max voltage
—
kV

At a glance

TAP171638 is an electric substation in New Jersey on ATLANTIC CITY ELECTRIC CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is RED LION in New Castle County, with a DC Readiness score of 71/100.

TAP171638 is an electric transmission substation in New Jersey, on ATLANTIC CITY ELECTRIC CO's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)ATLANTIC CITY ELECTRIC CO
Coordinates39.6368, -75.4318

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#173966—ATLANTIC CITY ELECTRIC COIN SERVICE10.6 mi
#173967—ATLANTIC CITY ELECTRIC COIN SERVICE5.5 mi
#173972—ATLANTIC CITY ELECTRIC COIN SERVICE5.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP171638, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP171638 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RED LIONSubstation-AdjacentDENew Castle County500 kV1,000 MW1.5 yrs70.6
KEENEYSubstation-AdjacentDENew Castle County500 kV1,000 MW1.5 yrs70.6
McKees Solar ParkBrownfieldDENew Castle—0 MW1.5 yrs69.1
EDDYSTONESubstation-AdjacentPADelaware County230 kV300 MW3.6 yrs69.0
UNKNOWN130225Substation-AdjacentDEDelaware County230 kV300 MW1.5 yrs68.8
DuPont NewportBrownfieldDENew Castle—1 MW1.5 yrs68.4
SCHUYLKILLSubstation-AdjacentPAPhiladelphia County230 kV300 MW3.6 yrs68.2
UNKNOWN128234Substation-AdjacentDEDelaware County230 kV300 MW1.5 yrs67.8

Who owns the transmission lines at TAP171638?

The 3 connected lines listed above are owned by ATLANTIC CITY ELECTRIC CO. Their combined recorded length is about 21.3 miles.

How do candidate sites near TAP171638 score?

The 8 highest-scoring candidate sites within about 25 miles range from 68 to 71 on the 0–100 DC Readiness scale. They fall in New Castle County, New Castle, Delaware County, Philadelphia County. The New Jersey average across 1,055 scored sites is 55.2. 160 of those New Jersey sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP171638 substation?

3 transmission lines terminate at or pass through TAP171638 in the HIFLD line data. Together the listed lines cover about 21.3 miles.

Who owns TAP171638 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP171638 belong to ATLANTIC CITY ELECTRIC CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP171638 substation located?

TAP171638 is in New Jersey at 39.6368, -75.4318. The datacenter candidate sites closest to it are in New Castle County, New Castle, Delaware County.

Are there datacenter candidate sites near TAP171638 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP171638. The highest-scoring is RED LION at 71/100. Across New Jersey, the average DC Readiness score is 55.2.

More in New Jersey

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP171638 substation, New Jersey”, https://gridcensus.com/substations/new-jersey/tap171638-40d66520 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP171638 substation, New Jersey is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.