TAP310942

Substation

Nevada

Max voltage
69
kV

At a glance

TAP310942 is a 69 kV electric substation in Nevada, recorded in the HIFLD transmission dataset. -999,999 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is OZ Clark in Clark, with a DC Readiness score of 62/100.

TAP310942 is an electric transmission substation in Nevada. It is classified as distribution (69–115 kv) and connects -999,999 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines-999,999

Ownership

No owner is recorded for the lines that connect here.

StateNevada
Coordinates35.9708, -114.8070

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30061369 kV——2.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310942, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310942 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ ClarkGreenfieldNVClark——7.6 yrs61.8
MEADSubstation-AdjacentNVClark County500 kV1,000 MW7.6 yrs61.8
CLARKSubstation-AdjacentNVClark County230 kV300 MW7.6 yrs61.8
OZ ClarkGreenfieldNVClark——7.6 yrs61.7
OZ ClarkGreenfieldNVClark——7.6 yrs61.3
EC Coal Clark CountyGreenfieldNVClark County——7.6 yrs61.2
MARKETPLACESubstation-AdjacentNVClark County500 kV1,000 MW7.6 yrs61.0
OZ ClarkGreenfieldNVClark——7.6 yrs61.0

How do candidate sites near TAP310942 score?

The 8 highest-scoring candidate sites within about 25 miles range from 61 to 62 on the 0–100 DC Readiness scale. They fall in Clark, Clark County. The Nevada average across 1,809 scored sites is 48.5. 250 of those Nevada sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP310942 substation?

TAP310942 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP310942 is below the national midpoint.

How many transmission lines connect to TAP310942 substation?

-999,999 transmission lines terminate at or pass through TAP310942 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 2.5 miles.

Where is TAP310942 substation located?

TAP310942 is in Nevada at 35.9708, -114.8070. The datacenter candidate sites closest to it are in Clark, Clark County.

Are there datacenter candidate sites near TAP310942 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP310942. The highest-scoring is OZ Clark at 62/100. Across Nevada, the average DC Readiness score is 48.5.

More in Nevada

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP310942 substation, Nevada”, https://gridcensus.com/substations/nevada/tap310942-59ad1689 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP310942 substation, Nevada is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.