Skip to content
Gridcensus

TAP153231

Substation

Missouri

Max voltage
138
kV

TAP153231 is an electric transmission substation in Missouri. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates37.8028, -90.4236

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153231, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153231 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RUSH ISLANDSubstation-AdjacentMOMonroe County345 kV600 MW4.3 yrs66.1
UNKNOWN121749Substation-AdjacentMOMonroe County345 kV600 MW4.3 yrs61.9
TAP160053Substation-AdjacentILMonroe County345 kV600 MW4.8 yrs61.5
ST FRANCOISSubstation-AdjacentMOSt. Francois County345 kV600 MW4.3 yrs61.2
EC Near Walton Street SubstationGreenfieldMOSt. Francois——4.3 yrs57.2
EC Near Rush IslandGreenfieldMOJefferson——4.3 yrs57.2
EC Near Rush IslandGreenfieldMOJefferson——4.3 yrs57.1
EC Near Rush IslandGreenfieldMOJefferson——4.3 yrs57.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP153231 substation, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.