Skip to content
Gridcensus

EC Near Rush Island

Greenfield

Jefferson, Missouri · MISO

DC Readiness
57.7
Good / 100

EC Near Rush Island is a greenfield datacenter candidate site in Jefferson, Missouri, interconnecting through MISO. It screens at 57.7/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh
UtilityCITIZENS ELECTRIC CORPORATION - (MO)cooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPCogent St Louis
IXP distance40.2 mi
Fiber providers5
Fiber coverage34.7%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance299.5 mi

Site characteristics

Site typeGreenfield
Land contactJefferson County Assessor
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay
Former usenear retired coal plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index96.0 (avg 100)

Location context

Nearest datacenterTierPoint St Louis
DC distance40.5 mi
Nearest rail4.4 mi
Nearest gas pipeline8.4 mi
Nearest fiber route234.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.54¢/kWh
Industrial electricity7.73¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,915

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Rush Island

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
56
Energy cost10%
91
Water risk7%
92
Natural hazard6%
62
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
70
Gas pipeline2%
73
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson, ranked by DC Readiness.

Sites near EC Near Rush Island
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117709Substation-Adjacent345 kV600 MW2.8 yrs61.8
EC Near Rush IslandGreenfield1.4 yrs57.8
EC Near Rush IslandGreenfield1.4 yrs57.7
UNKNOWN117702Substation-Adjacent138 kV100 MW2.8 yrs57.3
EC Near Rush IslandGreenfield1.4 yrs56.8
UNKNOWN117895Substation-Adjacent138 kV100 MW2.8 yrs56.5
TAP139433Substation-Adjacent138 kV100 MW2.8 yrs56.4
UNKNOWN121747Substation-Adjacent138 kV100 MW2.8 yrs56.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Rush Island, Jefferson. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.