TAP140527

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
69
kV

At a glance

TAP140527 is a 69 kV electric substation in Missouri on UNION ELECTRIC CO - (MO)'s transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Near La Plata in Macon, with a DC Readiness score of 61/100.

TAP140527 is an electric transmission substation in Missouri, on UNION ELECTRIC CO - (MO)'s transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)UNION ELECTRIC CO - (MO)
Coordinates39.8234, -92.1786

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10050669 kVUNION ELECTRIC CO - (MO)IN SERVICE0.0 mi
#13495669 kVUNION ELECTRIC CO - (MO)IN SERVICE22.5 mi
#13565669 kVUNION ELECTRIC CO - (MO)IN SERVICE16.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP140527, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP140527 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near La PlataGreenfieldMOMacon——4.3 yrs60.8
UNKNOWN117195Substation-AdjacentMORandolph County161 kV100 MW3.9 yrs59.7
OZ RandolphGreenfieldMORandolph——4.3 yrs59.4
EC Near KirksvilleGreenfieldMOAdair——4.3 yrs59.4
EC Near MaconGreenfieldMOMacon——4.3 yrs58.9
EC Near La PlataGreenfieldMOMacon——4.3 yrs58.9
EC Near MaconGreenfieldMOMacon——4.3 yrs58.6
EC Near La PlataGreenfieldMOMacon——4.3 yrs58.5

Who owns the transmission lines at TAP140527?

The 3 connected lines listed above are owned by UNION ELECTRIC CO - (MO). Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 39.1 miles.

How do candidate sites near TAP140527 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 61 on the 0–100 DC Readiness scale. They fall in Macon, Randolph County, Randolph, Adair. The Missouri average across 3,413 scored sites is 55.7. 1,002 of those Missouri sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP140527 substation?

TAP140527 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP140527 is below the national midpoint.

How many transmission lines connect to TAP140527 substation?

3 transmission lines terminate at or pass through TAP140527 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 39.1 miles.

Who owns TAP140527 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP140527 belong to UNION ELECTRIC CO - (MO). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP140527 substation located?

TAP140527 is in Missouri at 39.8234, -92.1786. The datacenter candidate sites closest to it are in Macon, Randolph County, Randolph.

Are there datacenter candidate sites near TAP140527 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP140527. The highest-scoring is EC Near La Plata at 61/100. Across Missouri, the average DC Readiness score is 55.7.

More in Missouri

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP140527 substation, Missouri”, https://gridcensus.com/substations/missouri/tap140527-80263a4b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP140527 substation, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.