EC Near Kirksville is a greenfield datacenter candidate site in Adair, Missouri, interconnecting through MISO. It screens at 57.2/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPConnect Des Moines
IXP distance114.6 mi
Fiber providers5
Fiber coverage55.4%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance122.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerUNION ELECTRIC CO - (MO)
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usenear retired gas plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index96.0 (avg 100)

Location context

Nearest datacenterCenturyLink
DC distance84.3 mi
Nearest rail6.5 mi
Nearest gas pipeline29.8 mi
Nearest fiber route257.1 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.58¢/kWh
Industrial electricity7.49¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,098

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
48
Fiber connectivity12%
59
Energy cost10%
89
Water risk8%
87
Natural hazard8%
62
Buildability7%
92
Labor market4%
50
DC cluster4%
25
Land / acreage3%
49
Construction cost3%
70
Gas pipeline2%
4
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Adair, ranked by DC Readiness.

Sites near EC Near Kirksville
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117964Substation-Adjacent161 kV100 MW1.4 yrs64.8
EC Near KirksvilleGreenfield1.4 yrs57.8
La PlataBrownfield4 MW1.4 yrs56.9
EC Near KirksvilleGreenfield1.4 yrs56.9
EC Near KirksvilleGreenfield1.4 yrs56.7
OZ AdairGreenfield1.4 yrs56.5
EC Near KirksvilleGreenfield1.4 yrs56.2
KirksvilleBrownfield15 MW1.4 yrs56.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.