Datacenter Sites in Adair, Missouri

Adair has 22 scored datacenter candidate sites averaging 54.7/100 DC Readiness, with a catalogued aggregate of 319 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

22
Candidate sites
54.7/100
Avg DC Readiness
319 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Adair

Site-selection context for Adair

Yessales_tax_exemption
Datacenter tax incentive
10.58¢/kWh
Commercial electricity
7.49¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$4,098
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in Adair

Top datacenter sites in Adair
SiteTypeVoltageCapacityQueue waitScore
EC Near KirksvilleGreenfield1.4 yrs62.1
EC Near KirksvilleGreenfield1.4 yrs61.6
EC Near KirksvilleGreenfield1.4 yrs61.5
EC Near KirksvilleGreenfield1.4 yrs61.2
OZ AdairGreenfield1.4 yrs60.7
EC Near KirksvilleGreenfield1.4 yrs60.5
EC Near KirksvilleGreenfield1.4 yrs60.3
EC Near KirksvilleGreenfield1.4 yrs60.1
EC Near KirksvilleGreenfield1.4 yrs59.7
EC Near KirksvilleGreenfield1.4 yrs59.6
EC Near KirksvilleGreenfield1.4 yrs58.0
EC Near KirksvilleGreenfield1.4 yrs56.7
UNKNOWN117964Substation-Adjacent161 kV100 MW2.8 yrs56.4
OZ AdairGreenfield1.4 yrs55.0
UNKNOWN117115Substation-Adjacent69 kV50 MW2.8 yrs54.8
UNKNOWN118649Substation-Adjacent69 kV50 MW2.8 yrs54.4
UNKNOWN118648Substation-Adjacent69 kV50 MW2.8 yrs54.4
UNKNOWN117152Substation-Adjacent69 kV50 MW2.8 yrs53.9
UNKNOWN117816Substation-Adjacent69 kV50 MW2.8 yrs53.6
TAP140608Substation-Adjacent69 kV50 MW2.8 yrs53.6
UNKNOWN118647Substation-Adjacent69 kV50 MW2.8 yrs53.6
TAP140607Substation-Adjacent69 kV50 MW2.8 yrs53.6
TAP140621Substation-Adjacent69 kV50 MW2.8 yrs53.6
UNKNOWN117967Substation-Adjacent69 kV50 MW2.8 yrs53.6
Morrow RecyclingIndustrial2.8 yrs53.1

Adair datacenter FAQ

How many datacenter sites are in Adair?
22 scored datacenter candidate sites, averaging 54.7/100 DC Readiness.
Does Adair offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Adair?
FEMA's National Risk Index rates Adair as "Relatively High" (score 38).
What are industrial electricity rates in Adair?
Average industrial electricity is 7.49¢/kWh and commercial is 10.58¢/kWh in Adair.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Adair, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.