TAP138910
SubstationMissouri · UNION ELECTRIC CO - (MO)
At a glance
TAP138910 is an electric transmission substation in Missouri, on UNION ELECTRIC CO - (MO)'s transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #128272 | 138 kV | UNION ELECTRIC CO - (MO) | IN SERVICE | 10.8 mi |
| #138930 | 138 kV | UNION ELECTRIC CO - (MO) | IN SERVICE | 18.1 mi |
| #142165 | 138 kV | UNION ELECTRIC CO - (MO) | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP138910, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| FRANKS | Substation-Adjacent | MO | Pulaski County | 345 kV | 600 MW | 3.9 yrs | 62.5 |
| MARIOSA DELTA | Substation-Adjacent | MO | Osage County | 345 kV | 600 MW | 4.3 yrs | 61.5 |
| OZ Cole | Greenfield | MO | Cole | — | — | 4.3 yrs | 60.9 |
| OZ Cole | Greenfield | MO | Cole | — | — | 4.3 yrs | 60.4 |
| OZ Pulaski | Greenfield | MO | Pulaski | — | — | 3.9 yrs | 59.7 |
| EC Coal Cole County | Greenfield | MO | Cole County | — | — | 4.3 yrs | 59.3 |
| UNKNOWN121199 | Substation-Adjacent | MO | Moniteau County | 161 kV | 100 MW | 4.3 yrs | 58.8 |
| TAP138905 | Substation-Adjacent | MO | Moniteau County | 161 kV | 100 MW | 4.3 yrs | 58.7 |
Who owns the transmission lines at TAP138910?
The 3 connected lines listed above are owned by UNION ELECTRIC CO - (MO). Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 28.9 miles.
How do candidate sites near TAP138910 score?
The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in Pulaski County, Osage County, Cole, Pulaski. The Missouri average across 3,413 scored sites is 55.7. 1,002 of those Missouri sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP138910 substation?
TAP138910 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP138910 is above the national midpoint.
How many transmission lines connect to TAP138910 substation?
3 transmission lines terminate at or pass through TAP138910 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 28.9 miles.
Who owns TAP138910 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP138910 belong to UNION ELECTRIC CO - (MO). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP138910 substation located?
TAP138910 is in Missouri at 38.2960, -92.3323. The datacenter candidate sites closest to it are in Pulaski County, Osage County, Cole.
Are there datacenter candidate sites near TAP138910 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP138910. The highest-scoring is FRANKS at 63/100. Across Missouri, the average DC Readiness score is 55.7.
More in Missouri
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP138910 substation, Missouri”, https://gridcensus.com/substations/missouri/tap138910-3019bd6e (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP138910 substation, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.