MARIOSA DELTA

Substation-Adjacent

Osage County, Missouri · MISO

DC Readiness
60.8
Good / 100

MARIOSA DELTA is a substation-adjacent datacenter candidate site in Osage County, Missouri, interconnecting through MISO. It screens at 60.8/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMARIOSA DELTA
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait2.8 yrs

Connectivity

Nearest IXPTierPoint St. Louis – Millpark
IXP distance88.3 mi
Fiber providers4
Fiber coverage3.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterCarfax
DC distance29.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.15¢/kWh
Industrial electricity8.65¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$3,470

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track MARIOSA DELTA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
45
Fiber connectivity12%
51
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Osage County, ranked by DC Readiness.

Sites near MARIOSA DELTA
SiteTypeVoltageCapacityQueue waitScore
LOOSE CREEKSubstation-Adjacent345 kV600 MW2.8 yrs59.3
EC Coal Osage CountyGreenfield——1.4 yrs56.9
EC Coal Osage CountyGreenfield——1.4 yrs56.0
UNKNOWN121455Substation-Adjacent161 kV100 MW2.8 yrs53.8
TAP138918Substation-Adjacent138 kV100 MW2.8 yrs53.8
UNKNOWN121456Substation-Adjacent161 kV100 MW2.8 yrs53.8
Greenfield (MARIOSA DELTA - LOOSE CREEK)Greenfield345 kV600 MW2.8 yrs53.4
EC Coal Osage CountyGreenfield——1.4 yrs52.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.