Skip to content
Gridcensus

LINCOLN AVE (UPPCO)

Substation

Michigan

Max voltage
—
kV

At a glance

LINCOLN AVE (UPPCO) is an electric substation in Michigan, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is IRON GROVE in Iron County, with a DC Readiness score of 56/100.

LINCOLN AVE (UPPCO) is an electric transmission substation in Michigan. It is classified as unclassified and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines2

Ownership

No owner is recorded for the lines that connect here.

Coordinates46.0877, -88.6282

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#173601——IN SERVICE13.7 mi
#173602——IN SERVICE1.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LINCOLN AVE (UPPCO), ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LINCOLN AVE (UPPCO) substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
IRON GROVESubstation-AdjacentMIIron County138 kV100 MW2.2 yrs56.2
OZ IronGreenfieldMIIron——2.2 yrs54.9
ASPENSubstation-AdjacentWIFlorence County138 kV100 MW4.3 yrs54.8
UNKNOWN128830Substation-AdjacentMIIron County69 kV50 MW2.2 yrs54.6
FLORENCESubstation-AdjacentWIFlorence County69 kV50 MW4.3 yrs52.5
EC FFE Iron CountyGreenfieldMIIron County——2.2 yrs51.2
OTTAWA NATIONAL FORESTFederal ExcessMIHoughton County——2.2 yrs51.1
CHEQUAMEGON N.F.Federal ExcessWIFlorence County——4.3 yrs48.3

How do candidate sites near LINCOLN AVE (UPPCO) score?

The 8 highest-scoring candidate sites within about 25 miles range from 48 to 56 on the 0–100 DC Readiness scale. They fall in Iron County, Iron, Florence County, Houghton County. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to LINCOLN AVE (UPPCO) substation?

2 transmission lines terminate at or pass through LINCOLN AVE (UPPCO) in the HIFLD line data. Together the listed lines cover about 15.2 miles.

Where is LINCOLN AVE (UPPCO) substation located?

LINCOLN AVE (UPPCO) is in Michigan at 46.0877, -88.6282. The datacenter candidate sites closest to it are in Iron County, Iron, Florence County.

Are there datacenter candidate sites near LINCOLN AVE (UPPCO) substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of LINCOLN AVE (UPPCO). The highest-scoring is IRON GROVE at 56/100. Across Michigan, the average DC Readiness score is 55.2.

More in Michigan

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “LINCOLN AVE (UPPCO) substation, Michigan”, https://gridcensus.com/substations/michigan/lincoln-ave-uppco-287e9a69 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for LINCOLN AVE (UPPCO) substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.