SOUTH AGAWAM SWITCHING STATION

Substation

Massachusetts · CONNECTICUT LIGHT & POWER CO

Max voltage
115
kV

At a glance

SOUTH AGAWAM SWITCHING STATION is a 115 kV electric substation in Massachusetts on CONNECTICUT LIGHT & POWER CO's transmission network, recorded in the HIFLD transmission dataset. 5 transmission lines connect to it. 39 of Massachusetts's 229 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN133485 in Hampden County, with a DC Readiness score of 69/100.

SOUTH AGAWAM SWITCHING STATION is an electric transmission substation in Massachusetts, on CONNECTICUT LIGHT & POWER CO's transmission network. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership

Line owner (most lines)CONNECTICUT LIGHT & POWER CO
Coordinates42.0494, -72.6479

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#110317115 kV—IN SERVICE9.1 mi
#124561115 kV—IN SERVICE0.9 mi
#144623115 kV——0.1 mi
#145091115 kV—IN SERVICE0.9 mi
#157045115 kVCONNECTICUT LIGHT & POWER COIN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SOUTH AGAWAM SWITCHING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SOUTH AGAWAM SWITCHING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133485Substation-AdjacentMAHampden County345 kV600 MW4.3 yrs68.5
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW4.3 yrs68.4
MANCHESTERSubstation-AdjacentCTCapitol Planning Region345 kV600 MW4.3 yrs68.3
NORTH BLOOMFIELDSubstation-AdjacentCTCapitol Planning Region345 kV600 MW4.3 yrs67.9
BARBOUR HILLSubstation-AdjacentCTCapitol Planning Region345 kV600 MW4.3 yrs67.9
AGAWAMSubstation-AdjacentMAHampden County345 kV600 MW4.3 yrs66.2
LUDLOWSubstation-AdjacentMAHampden County345 kV600 MW4.3 yrs64.6
TAP136500Substation-AdjacentCTCapitol Planning Region115 kV100 MW4.3 yrs63.4

How does SOUTH AGAWAM SWITCHING STATION compare with other substations in Massachusetts?

Massachusetts has 612 substation records in HIFLD, of which 229 carry a station name; the rest are unnamed tap points, risers and line ends. 144 named substations in the state are in SOUTH AGAWAM SWITCHING STATION's 115–229 kV band (63% of named stations). 39 sit in a higher band. 31 named substations in Massachusetts operate at 345 kV or above. The highest voltage recorded in the state is 345 kV, and the state median is 115 kV.

Who owns the transmission lines at SOUTH AGAWAM SWITCHING STATION?

The 5 connected lines listed above are owned by CONNECTICUT LIGHT & POWER CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 13.6 miles.

How do candidate sites near SOUTH AGAWAM SWITCHING STATION score?

The 8 highest-scoring candidate sites within about 25 miles range from 63 to 69 on the 0–100 DC Readiness scale. They fall in Hampden County, Capitol Planning Region. The Massachusetts average across 1,861 scored sites is 54.2. 305 of those Massachusetts sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is SOUTH AGAWAM SWITCHING STATION substation?

SOUTH AGAWAM SWITCHING STATION has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so SOUTH AGAWAM SWITCHING STATION is at the national midpoint.

How many transmission lines connect to SOUTH AGAWAM SWITCHING STATION substation?

5 transmission lines terminate at or pass through SOUTH AGAWAM SWITCHING STATION in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 13.6 miles.

Who owns SOUTH AGAWAM SWITCHING STATION substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at SOUTH AGAWAM SWITCHING STATION belong to CONNECTICUT LIGHT & POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is SOUTH AGAWAM SWITCHING STATION substation located?

SOUTH AGAWAM SWITCHING STATION is in Massachusetts at 42.0494, -72.6479. The datacenter candidate sites closest to it are in Hampden County, Capitol Planning Region.

Are there datacenter candidate sites near SOUTH AGAWAM SWITCHING STATION substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of SOUTH AGAWAM SWITCHING STATION. The highest-scoring is UNKNOWN133485 at 69/100. Across Massachusetts, the average DC Readiness score is 54.2.

Other 115 kV substations in Massachusetts

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “SOUTH AGAWAM SWITCHING STATION substation, Massachusetts”, https://gridcensus.com/substations/massachusetts/south-agawam-switching-station-39956292 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for SOUTH AGAWAM SWITCHING STATION substation, Massachusetts is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.