Skip to content
Gridcensus

SWAN

Substation

Louisiana · ENTERGY GULF STATES - LA LLC

Max voltage
69
kV

At a glance

SWAN is a 69 kV electric substation in Louisiana on ENTERGY GULF STATES - LA LLC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. 181 of Louisiana's 297 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is WILLOW GLEN (500KV) in Ascension Parish, with a DC Readiness score of 72/100.

SWAN is an electric transmission substation in Louisiana, on ENTERGY GULF STATES - LA LLC's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)ENTERGY GULF STATES - LA LLC
Coordinates30.5303, -91.1879

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13630769 kVENTERGY GULF STATES - LA LLCIN SERVICE2.0 mi
#14308069 kVENTERGY GULF STATES - LA LLCIN SERVICE0.9 mi
#111493—ENTERGY GULF STATES - LA LLCIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SWAN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SWAN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WILLOW GLEN (500KV)Substation-AdjacentLAAscension Parish500 kV1,000 MW4.3 yrs71.9
UNKNOWN112075Substation-AdjacentLAWest Feliciana Parish500 kV1,000 MW4.3 yrs69.2
COLYSubstation-AdjacentLALivingston Parish500 kV1,000 MW4.3 yrs67.1
UNKNOWN149836Substation-AdjacentLAIberville Parish500 kV1,000 MW4.3 yrs66.5
WEBRESubstation-AdjacentLAWest Baton Rouge Parish500 kV1,000 MW4.3 yrs65.4
FANCY POINTSubstation-AdjacentLAWest Feliciana Parish500 kV1,000 MW4.3 yrs65.0
HAZELSubstation-AdjacentLAEast Baton Rouge Parish230 kV300 MW4.3 yrs64.7
OAK VILLASubstation-AdjacentLAEast Baton Rouge Parish230 kV300 MW4.3 yrs64.7

How does SWAN compare with other substations in Louisiana?

Louisiana has 1,305 substation records in HIFLD, of which 297 carry a station name; the rest are unnamed tap points, risers and line ends. 62 named substations in the state are in SWAN's 69–114 kV band (21% of named stations). 181 sit in a higher band. 17 named substations in Louisiana operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

Who owns the transmission lines at SWAN?

The 3 connected lines listed above are owned by ENTERGY GULF STATES - LA LLC. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 3.1 miles.

How do candidate sites near SWAN score?

The 8 highest-scoring candidate sites within about 25 miles range from 65 to 72 on the 0–100 DC Readiness scale. They fall in Ascension Parish, West Feliciana Parish, Livingston Parish, Iberville Parish. The Louisiana average across 1,762 scored sites is 53.1. 615 of those Louisiana sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is SWAN substation?

SWAN has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so SWAN is below the national midpoint.

How many transmission lines connect to SWAN substation?

3 transmission lines terminate at or pass through SWAN in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 3.1 miles.

Who owns SWAN substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at SWAN belong to ENTERGY GULF STATES - LA LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is SWAN substation located?

SWAN is in Louisiana at 30.5303, -91.1879. The datacenter candidate sites closest to it are in Ascension Parish, West Feliciana Parish, Livingston Parish.

Are there datacenter candidate sites near SWAN substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of SWAN. The highest-scoring is WILLOW GLEN (500KV) at 72/100. Across Louisiana, the average DC Readiness score is 53.1.

Other 69 kV substations in Louisiana

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “SWAN substation, Louisiana”, https://gridcensus.com/substations/louisiana/swan-1fc1fa3f (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for SWAN substation, Louisiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.