TAP159547 is an electric substation in Kansas on WESTAR ENERGY INC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is WICHITA in Sedgwick County, with a DC Readiness score of 65/100.

TAP159547 is an electric transmission substation in Kansas, on WESTAR ENERGY INC's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)WESTAR ENERGY INC
StateKansas
Coordinates38.1156, -97.4033

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#161463—WESTAR ENERGY INCIN SERVICE3.6 mi
#161464—WESTAR ENERGY INCIN SERVICE1.7 mi
#161465—WESTAR ENERGY INCIN SERVICE4.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP159547, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP159547 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WICHITASubstation-AdjacentKSSedgwick County345 kV600 MW4.3 yrs65.3
BENTONSubstation-AdjacentKSSedgwick County345 kV600 MW4.3 yrs61.7
RENOSubstation-AdjacentKSReno County345 kV600 MW4.3 yrs61.3
UNKNOWN118044Substation-AdjacentKSMcPherson County230 kV300 MW4.3 yrs59.5
EC Near Gordon Evans Energy CenterGreenfieldKSSedgwick——4.3 yrs58.6
EC Near Gordon Evans Energy CenterGreenfieldKSSedgwick——4.3 yrs58.6
EC Near Hutchinson Energy CenterGreenfieldKSReno——4.3 yrs57.7
EC Near McPherson 2GreenfieldKSMcPherson——4.3 yrs57.7

Who owns the transmission lines at TAP159547?

The 3 connected lines listed above are owned by WESTAR ENERGY INC. Their combined recorded length is about 9.4 miles.

How do candidate sites near TAP159547 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 65 on the 0–100 DC Readiness scale. They fall in Sedgwick County, Reno County, McPherson County, Sedgwick. The Kansas average across 2,352 scored sites is 53.2. 730 of those Kansas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP159547 substation?

3 transmission lines terminate at or pass through TAP159547 in the HIFLD line data. Together the listed lines cover about 9.4 miles.

Who owns TAP159547 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP159547 belong to WESTAR ENERGY INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP159547 substation located?

TAP159547 is in Kansas at 38.1156, -97.4033. The datacenter candidate sites closest to it are in Sedgwick County, Reno County, McPherson County.

Are there datacenter candidate sites near TAP159547 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP159547. The highest-scoring is WICHITA at 65/100. Across Kansas, the average DC Readiness score is 53.2.

More in Kansas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP159547 substation, Kansas”, https://gridcensus.com/substations/kansas/tap159547-fc99a0a3 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP159547 substation, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.