Skip to content
Gridcensus

TAP167921

Substation

Iowa · MIDAMERICAN ENERGY CO

Max voltage
69
kV

At a glance

TAP167921 is a 69 kV electric substation in Iowa on MIDAMERICAN ENERGY CO's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN130423 in Sac County, with a DC Readiness score of 58/100.

TAP167921 is an electric transmission substation in Iowa, on MIDAMERICAN ENERGY CO's transmission network. It is classified as distribution (69–115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines2

Ownership

Line owner (most lines)MIDAMERICAN ENERGY CO
StateIowa
Coordinates42.4746, -95.4943

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16901669 kVMIDAMERICAN ENERGY COIN SERVICE0.1 mi
#16901769 kVMIDAMERICAN ENERGY COIN SERVICE5.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167921, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167921 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN130423Substation-AdjacentIASac County161 kV100 MW4.3 yrs58.3
EC Coal Woodbury CountyGreenfieldIAWoodbury County——4.3 yrs58.2
EC Near Alta Municipal UtilitiesGreenfieldIABuena Vista——4.3 yrs57.9
EC Near Alta Municipal UtilitiesGreenfieldIABuena Vista——4.3 yrs57.7
UNKNOWN130491Substation-AdjacentIACherokee County161 kV100 MW4.3 yrs57.6
EC Near Alta Municipal UtilitiesGreenfieldIABuena Vista——4.3 yrs57.4
UNKNOWN130492Substation-AdjacentIAIda County161 kV100 MW4.3 yrs57.4
EC Near Alta Municipal UtilitiesGreenfieldIABuena Vista——4.3 yrs57.3

Who owns the transmission lines at TAP167921?

The 2 connected lines listed above are owned by MIDAMERICAN ENERGY CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 5.4 miles.

How do candidate sites near TAP167921 score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 58 on the 0–100 DC Readiness scale. They fall in Sac County, Woodbury County, Buena Vista, Cherokee County. The Iowa average across 2,572 scored sites is 56.4. 761 of those Iowa sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP167921 substation?

TAP167921 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP167921 is below the national midpoint.

How many transmission lines connect to TAP167921 substation?

2 transmission lines terminate at or pass through TAP167921 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 5.4 miles.

Who owns TAP167921 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP167921 belong to MIDAMERICAN ENERGY CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP167921 substation located?

TAP167921 is in Iowa at 42.4746, -95.4943. The datacenter candidate sites closest to it are in Sac County, Woodbury County, Buena Vista.

Are there datacenter candidate sites near TAP167921 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP167921. The highest-scoring is UNKNOWN130423 at 58/100. Across Iowa, the average DC Readiness score is 56.4.

More in Iowa

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP167921 substation, Iowa”, https://gridcensus.com/substations/iowa/tap167921-4ed2d955 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP167921 substation, Iowa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.