TAP167905

Substation

Iowa · MIDAMERICAN ENERGY CO

Max voltage
69
kV

At a glance

TAP167905 is a 69 kV electric substation in Iowa on MIDAMERICAN ENERGY CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN138106 in O'Brien County, with a DC Readiness score of 64/100.

TAP167905 is an electric transmission substation in Iowa, on MIDAMERICAN ENERGY CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)MIDAMERICAN ENERGY CO
StateIowa
Coordinates42.7064, -95.4176

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16899669 kV—IN SERVICE11.2 mi
#16899769 kV—IN SERVICE1.6 mi
#16908669 kVMIDAMERICAN ENERGY COIN SERVICE9.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167905, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167905 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN138106Substation-AdjacentIAO'Brien County345 kV600 MW4.3 yrs63.7
EC Near PrimgharGreenfieldIAO'Brien——4.3 yrs60.7
EC Near PrimgharGreenfieldIAO'Brien——4.3 yrs60.5
EC Near PrimgharGreenfieldIAO'Brien——4.3 yrs59.9
EC Near PrimgharGreenfieldIAO'Brien——4.3 yrs58.7
UNKNOWN167975Substation-AdjacentIAClay County69 kV50 MW4.3 yrs58.5
UNKNOWN130423Substation-AdjacentIASac County161 kV100 MW4.3 yrs58.3
EC Coal Woodbury CountyGreenfieldIAWoodbury County——4.3 yrs58.2

Who owns the transmission lines at TAP167905?

The 3 connected lines listed above are owned by MIDAMERICAN ENERGY CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 22.4 miles.

How do candidate sites near TAP167905 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 64 on the 0–100 DC Readiness scale. They fall in O'Brien County, O'Brien, Clay County, Sac County. The Iowa average across 2,572 scored sites is 56.4. 761 of those Iowa sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP167905 substation?

TAP167905 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP167905 is below the national midpoint.

How many transmission lines connect to TAP167905 substation?

3 transmission lines terminate at or pass through TAP167905 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 22.4 miles.

Who owns TAP167905 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP167905 belong to MIDAMERICAN ENERGY CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP167905 substation located?

TAP167905 is in Iowa at 42.7064, -95.4176. The datacenter candidate sites closest to it are in O'Brien County, O'Brien, Clay County.

Are there datacenter candidate sites near TAP167905 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP167905. The highest-scoring is UNKNOWN138106 at 64/100. Across Iowa, the average DC Readiness score is 56.4.

More in Iowa

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP167905 substation, Iowa”, https://gridcensus.com/substations/iowa/tap167905-5a47e9d9 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP167905 substation, Iowa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.