TAP155703 is an electric transmission substation in Georgia. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateGeorgia
Coordinates30.8290, -83.5612

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155703, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155703 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111593Substation-AdjacentGABrooks County230 kV300 MW5.8 yrs61.2
UNKNOWN111571Substation-AdjacentGALowndes County230 kV300 MW5.8 yrs61.0
UNKNOWN111125Substation-AdjacentGACook County230 kV300 MW5.8 yrs61.0
UNKNOWN111575Substation-AdjacentGALowndes County230 kV300 MW5.8 yrs60.9
UNKNOWN111584Substation-AdjacentGALowndes County230 kV300 MW5.8 yrs60.9
OZ LowndesGreenfieldGALowndes——5.8 yrs60.2
OZ LowndesGreenfieldGALowndes——5.8 yrs59.5
UNKNOWN108203Substation-AdjacentFLJefferson County115 kV100 MW3.7 yrs57.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP155703 substation, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.