OZ Lowndes

Greenfield

Lowndes County, Georgia · SERC

DC Readiness
61.9
Good / 100

OZ Lowndes is a greenfield datacenter candidate site in Lowndes County, Georgia, interconnecting through SERC. It screens at 61.9/100 DC Readiness and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance69.1 mi
Fiber providers13
Fiber coverage100.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance250.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerGEORGIA POWER CO
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone X
Water stress (WRI)1.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCRACKIN GOOD BAKERY
Hazard sub-score50/100
Construction cost index81.4 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance69.1 mi
Nearest rail0.5 mi
Nearest gas pipeline1.7 mi
Nearest fiber route136.9 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.66¢/kWh
Industrial electricity8.81¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$3,938

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
70
Fiber connectivity12%
75
Energy cost10%
89
Water risk8%
80
Natural hazard8%
50
Buildability7%
90
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
82
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
15

Nearby comparable sites

Other scored datacenter candidate sites in Lowndes County, ranked by DC Readiness.

Sites near OZ Lowndes
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111584Substation-Adjacent230 kV300 MW5.8 yrs72.6
UNKNOWN111575Substation-Adjacent230 kV300 MW5.8 yrs70.2
UNKNOWN107689Substation-Adjacent115 kV100 MW5.8 yrs68.6
UNKNOWN111579Substation-Adjacent115 kV100 MW5.8 yrs68.5
UNKNOWN111588Substation-Adjacent115 kV100 MW5.8 yrs68.2
UNKNOWN111576Substation-Adjacent115 kV100 MW5.8 yrs68.0
UNKNOWN111585Substation-Adjacent115 kV100 MW5.8 yrs67.7
UNKNOWN111580Substation-Adjacent115 kV100 MW5.8 yrs67.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Lowndes, Lowndes County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.