KENSINGTON

Substation

Georgia

Max voltage
230
kV

KENSINGTON is an electric transmission substation in Georgia. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateGeorgia
Coordinates34.8046, -85.4394

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of KENSINGTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near KENSINGTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WIDOWS CREEK 500KVSubstation-AdjacentALDade County500 kV1,000 MW3.9 yrs73.0
RACCOON MOUNTAINSubstation-AdjacentTNHamilton County500 kV1,000 MW3.9 yrs72.0
OZ HamiltonGreenfieldTNHamilton——3.9 yrs67.8
OZ HamiltonGreenfieldTNHamilton——3.9 yrs67.3
OZ HamiltonGreenfieldTNHamilton——3.9 yrs67.1
Volkswagen ChattanoogaBrownfieldTNHamilton161 kV10 MW3.9 yrs67.0
CONCORDSubstation-AdjacentTNCatoosa County230 kV300 MW3.9 yrs65.6
RIDGEDALESubstation-AdjacentTNHamilton County161 kV100 MW3.9 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for KENSINGTON substation, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.