WIDOWS CREEK 500KV

Substation-Adjacent

Dade County, Alabama · SERC

DC Readiness
73.0
Excellent / 100

At a glance

WIDOWS CREEK 500KV is a substation-adjacent datacenter candidate site in Dade County, Alabama, scoring 73.0/100 DC Readiness — 1st of 17 scored sites in the county. Its nearest substation is WIDOWS CREEK 500KV (0 mi, 500 kV). It sits in the SERC grid region and the NORTH ALABAMA ELECTRIC COOP service territory, where interconnection has averaged 3.9 years from request to operation. GridCensus catalogs 1,000 MW of candidate capacity here.

Power & interconnection

Nearest substationWIDOWS CREEK 500KV
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW
UtilityNORTH ALABAMA ELECTRIC COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPDC BLOX CHA1 - DCBLOX Chattanooga
IXP distance27.7 mi
Fiber providers3
Fiber coverage99.1%

Site characteristics

Former usecoal
Existing capacity1,969 MW
Retirement date2015-09-01

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score60/100

Location context

Nearest datacenterGoogle
DC distance1.9 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.81¢/kWh
Industrial electricity6.12¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$4,527

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; PSC review for very large loads.

DC tax incentiveYes
Large-load threshold≥ 150 MW

Alabama PSC review threshold for large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track WIDOWS CREEK 500KV

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does WIDOWS CREEK 500KV compare with other sites in Dade County?

WIDOWS CREEK 500KV ranks 1st of 17 scored candidate sites in Dade County. Its 73.0/100 is about 22% above the county average of 60.0. It is about 33% above the Alabama average of 55.0 and about 37% above the national average of 53.2.

Against the Alabama average, its strongest sub-score is power availability (100 vs 41) and its weakest is water (80 vs 91). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is WIDOWS CREEK 500KV to power, fiber and other datacenters?

The nearest mapped substation, WIDOWS CREEK 500KV, is about 0 miles away and operates at 500 kV. For connectivity, the nearest internet exchange facility is DC BLOX CHA1 - DCBLOX Chattanooga at 27.7 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Google, 1.9 miles away.

What are the flood, water and hazard risks at WIDOWS CREEK 500KV?

At the county level, FEMA's National Risk Index rates Dade County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power20%
75
Fiber connectivity12%
78
Energy cost10%
50
Water risk7%
80
Natural hazard6%
60
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Dade County, ranked by DC Readiness.

Sites near WIDOWS CREEK 500KV
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109680Substation-Adjacent230 kV300 MW5.8 yrs64.6
KENSINGTONSubstation-Adjacent230 kV300 MW5.8 yrs63.8
CUMMINGSSubstation-Adjacent161 kV100 MW3.9 yrs63.1
TAP154384Substation-Adjacent161 kV100 MW3.9 yrs61.9
TAP161981Substation-Adjacent161 kV100 MW3.9 yrs61.7
TAP155377Substation-Adjacent161 kV100 MW3.9 yrs61.4
UNKNOWN173325Substation-Adjacent161 kV100 MW3.9 yrs61.3
BRYANTSubstation-Adjacent161 kV100 MW3.9 yrs61.3

WIDOWS CREEK 500KV: common questions

What is the DC Readiness score of WIDOWS CREEK 500KV?

WIDOWS CREEK 500KV scores 73.0/100 on the GridCensus DC Readiness scale, rated excellent. It ranks 1st of 17 scored sites in Dade County. The Dade County average is 60.0 and the Alabama average is 55.0.

What is the nearest substation to WIDOWS CREEK 500KV?

The nearest mapped substation is WIDOWS CREEK 500KV, about 0 miles away, at 500 kV. GridCensus catalogs 1,000 MW of candidate capacity for the site.

Which electric utility serves WIDOWS CREEK 500KV?

NORTH ALABAMA ELECTRIC COOP (cooperative) holds the retail service territory that contains the site.

What grid region is WIDOWS CREEK 500KV in?

WIDOWS CREEK 500KV is in the SERC region. Projects interconnecting there have averaged a 3.9-year wait from queue request to operation.

How far is WIDOWS CREEK 500KV from an internet exchange?

The nearest internet exchange facility is DC BLOX CHA1 - DCBLOX Chattanooga, about 27.7 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “WIDOWS CREEK 500KV, Dade County, AL”, https://gridcensus.com/datacenter-sites/alabama/dade-county/widows-creek-500kv-7ffc14f6 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for WIDOWS CREEK 500KV, Dade County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.