At a glance

TAP156275 is a 115 kV electric substation in Florida operated by GULF POWER CO, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is PINCKARD in Dale County, with a DC Readiness score of 65/100.

TAP156275 is an electric transmission substation in Florida, operated by GULF POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

StateFlorida
Coordinates30.9448, -85.9090

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#155933115 kVGULF POWER COIN SERVICE32.2 mi
#157206115 kVGULF POWER COIN SERVICE2.6 mi
#157208115 kV—IN SERVICE7.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP156275, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP156275 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PINCKARDSubstation-AdjacentALDale County230 kV300 MW3.9 yrs64.5
TAP143218Substation-AdjacentALGeneva County230 kV300 MW3.9 yrs63.6
OPPSubstation-AdjacentALCovington County230 kV300 MW3.9 yrs62.8
UNKNOWN109019Substation-AdjacentALGeneva County230 kV300 MW3.9 yrs62.4
UNKNOWN109018Substation-AdjacentALGeneva County230 kV300 MW3.9 yrs62.2
TAP143011Substation-AdjacentALDale County115 kV100 MW3.9 yrs60.3
UNKNOWN109009Substation-AdjacentALDale County115 kV100 MW3.9 yrs60.2
UNKNOWN109014Substation-AdjacentALDale County115 kV100 MW3.9 yrs60.1

Who owns the transmission lines at TAP156275?

The 3 connected lines listed above are owned by GULF POWER CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 42.1 miles.

How do candidate sites near TAP156275 score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 65 on the 0–100 DC Readiness scale. They fall in Dale County, Geneva County, Covington County. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP156275 substation?

TAP156275 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP156275 is at the national midpoint.

How many transmission lines connect to TAP156275 substation?

3 transmission lines terminate at or pass through TAP156275 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 42.1 miles.

Who owns TAP156275 substation?

HIFLD lists GULF POWER CO as the operator of TAP156275.

Where is TAP156275 substation located?

TAP156275 is in Florida at 30.9448, -85.9090. The datacenter candidate sites closest to it are in Dale County, Geneva County, Covington County.

Are there datacenter candidate sites near TAP156275 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP156275. The highest-scoring is PINCKARD at 65/100. Across Florida, the average DC Readiness score is 56.

More in Florida

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP156275 substation, Florida”, https://gridcensus.com/substations/florida/tap156275-21dd962a (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP156275 substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.