TAP143109

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
—
kV

At a glance

TAP143109 is an electric substation in Florida on DUKE ENERGY FLORIDA, LLC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN120742 in Leon County, with a DC Readiness score of 69/100.

TAP143109 is an electric transmission substation in Florida, on DUKE ENERGY FLORIDA, LLC's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)DUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates30.5407, -84.1765

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#104892—DUKE ENERGY FLORIDA, LLCIN SERVICE0.0 mi
#112557—DUKE ENERGY FLORIDA, LLC—5.9 mi
#146549—DUKE ENERGY FLORIDA, LLCIN SERVICE8.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143109, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143109 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN120742Substation-AdjacentFLLeon County230 kV300 MW3.7 yrs69.0
UNKNOWN120743Substation-AdjacentFLLeon County230 kV300 MW3.7 yrs66.7
LINE 17Substation-AdjacentFLLeon County230 kV300 MW3.7 yrs65.2
UNKNOWN162146Substation-AdjacentFLLeon County230 kV300 MW3.7 yrs65.1
OZ LeonGreenfieldFLLeon——3.7 yrs63.0
UNKNOWN107686Substation-AdjacentFLLeon County115 kV100 MW3.7 yrs62.5
UNKNOWN107679Substation-AdjacentFLLeon County115 kV100 MW3.7 yrs62.3
UNKNOWN107666Substation-AdjacentGADecatur County230 kV300 MW5.8 yrs61.9

Who owns the transmission lines at TAP143109?

The 3 connected lines listed above are owned by DUKE ENERGY FLORIDA, LLC. Their combined recorded length is about 14.7 miles.

How do candidate sites near TAP143109 score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 69 on the 0–100 DC Readiness scale. They fall in Leon County, Leon, Decatur County. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP143109 substation?

3 transmission lines terminate at or pass through TAP143109 in the HIFLD line data. Together the listed lines cover about 14.7 miles.

Who owns TAP143109 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP143109 belong to DUKE ENERGY FLORIDA, LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP143109 substation located?

TAP143109 is in Florida at 30.5407, -84.1765. The datacenter candidate sites closest to it are in Leon County, Leon, Decatur County.

Are there datacenter candidate sites near TAP143109 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP143109. The highest-scoring is UNKNOWN120742 at 69/100. Across Florida, the average DC Readiness score is 56.

More in Florida

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP143109 substation, Florida”, https://gridcensus.com/substations/florida/tap143109-65788923 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP143109 substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.