EAST ORANGE

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
—
kV

At a glance

EAST ORANGE is an electric substation in Florida on DUKE ENERGY FLORIDA, LLC's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is POINSETT in Brevard County, with a DC Readiness score of 67/100.

EAST ORANGE is an electric transmission substation in Florida, on DUKE ENERGY FLORIDA, LLC's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines1

Ownership

Line owner (most lines)DUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates28.5459, -81.2110

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#170775—DUKE ENERGY FLORIDA, LLCIN SERVICE2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EAST ORANGE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EAST ORANGE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
POINSETTSubstation-AdjacentFLBrevard County500 kV1,000 MW3.7 yrs67.2
SKY LAKESubstation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.9
CONVENTION CENTERSubstation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.8
UNKNOWN120236Substation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.8
RISER143336Substation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.6
STANTONSubstation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.4
UNKNOWN120225Substation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.0
MEADOW WOODS SOUTHSubstation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.0

Who owns the transmission lines at EAST ORANGE?

The 1 connected line listed above is owned by DUKE ENERGY FLORIDA, LLC. Their combined recorded length is about 2.9 miles.

How do candidate sites near EAST ORANGE score?

The 8 highest-scoring candidate sites within about 25 miles range from 66 to 67 on the 0–100 DC Readiness scale. They fall in Brevard County, Orange County. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to EAST ORANGE substation?

1 transmission line terminate at or pass through EAST ORANGE in the HIFLD line data. Together the listed lines cover about 2.9 miles.

Who owns EAST ORANGE substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at EAST ORANGE belong to DUKE ENERGY FLORIDA, LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is EAST ORANGE substation located?

EAST ORANGE is in Florida at 28.5459, -81.2110. The datacenter candidate sites closest to it are in Brevard County, Orange County.

Are there datacenter candidate sites near EAST ORANGE substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of EAST ORANGE. The highest-scoring is POINSETT at 67/100. Across Florida, the average DC Readiness score is 56.

More in Florida

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EAST ORANGE substation, Florida”, https://gridcensus.com/substations/florida/east-orange-c5fe174c (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for EAST ORANGE substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.