DEVILLIERS

Substation

Florida · GULF POWER CO

Max voltage
115
kV

At a glance

DEVILLIERS is a 115 kV electric substation in Florida on GULF POWER CO's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. 269 of Florida's 943 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN120703 in Santa Rosa County, with a DC Readiness score of 63/100.

DEVILLIERS is an electric transmission substation in Florida, on GULF POWER CO's transmission network. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership

Line owner (most lines)GULF POWER CO
StateFlorida
Coordinates30.4189, -87.2232

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#126266115 kVGULF POWER COIN SERVICE0.1 mi
#134212115 kVGULF POWER COIN SERVICE2.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEVILLIERS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEVILLIERS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN120703Substation-AdjacentFLSanta Rosa County230 kV300 MW3.7 yrs62.8
UNKNOWN120761Substation-AdjacentFLSanta Rosa County230 kV300 MW3.7 yrs61.8
BRENTWOODSubstation-AdjacentFLEscambia County230 kV300 MW3.7 yrs61.5
BELLVIEWSubstation-AdjacentFLEscambia County230 kV300 MW3.7 yrs61.4
UNKNOWN120681Substation-AdjacentFLEscambia County230 kV300 MW3.7 yrs61.4
UNKNOWN173475Substation-AdjacentFLEscambia County230 kV300 MW3.7 yrs61.3
UNKNOWN157814Substation-AdjacentFLEscambia County230 kV300 MW3.7 yrs61.2
BEULAHSubstation-AdjacentFLEscambia County230 kV300 MW3.7 yrs61.0

How does DEVILLIERS compare with other substations in Florida?

Florida has 2,533 substation records in HIFLD, of which 943 carry a station name; the rest are unnamed tap points, risers and line ends. 359 named substations in the state are in DEVILLIERS's 115–229 kV band (38% of named stations). 269 sit in a higher band. 15 named substations in Florida operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

Who owns the transmission lines at DEVILLIERS?

The 2 connected lines listed above are owned by GULF POWER CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 2.4 miles.

How do candidate sites near DEVILLIERS score?

The 8 highest-scoring candidate sites within about 25 miles range from 61 to 63 on the 0–100 DC Readiness scale. They fall in Santa Rosa County, Escambia County. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is DEVILLIERS substation?

DEVILLIERS has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so DEVILLIERS is at the national midpoint.

How many transmission lines connect to DEVILLIERS substation?

2 transmission lines terminate at or pass through DEVILLIERS in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 2.4 miles.

Who owns DEVILLIERS substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at DEVILLIERS belong to GULF POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is DEVILLIERS substation located?

DEVILLIERS is in Florida at 30.4189, -87.2232. The datacenter candidate sites closest to it are in Santa Rosa County, Escambia County.

Are there datacenter candidate sites near DEVILLIERS substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of DEVILLIERS. The highest-scoring is UNKNOWN120703 at 63/100. Across Florida, the average DC Readiness score is 56.

Other 115 kV substations in Florida

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “DEVILLIERS substation, Florida”, https://gridcensus.com/substations/florida/devilliers-0e710b1b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for DEVILLIERS substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.