DEADEND167104

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
115
kV

At a glance

DEADEND167104 is a 115 kV electric substation in Florida on DUKE ENERGY FLORIDA, LLC's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN120236 in Orange County, with a DC Readiness score of 67/100.

DEADEND167104 is an electric transmission substation in Florida, on DUKE ENERGY FLORIDA, LLC's transmission network. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership

Line owner (most lines)DUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates28.9114, -81.2919

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#149307115 kVDUKE ENERGY FLORIDA, LLC—3.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEADEND167104, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEADEND167104 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN120236Substation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.8
UNKNOWN120225Substation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.0
ALTAMONTE SPRINGSSubstation-AdjacentFLOrange County230 kV300 MW3.7 yrs66.0
OZ OrangeGreenfieldFLOrange——3.7 yrs65.9
PINE HILLSSubstation-AdjacentFLOrange County230 kV300 MW3.7 yrs65.9
WOODSMERESubstation-AdjacentFLOrange County230 kV300 MW3.7 yrs65.9
UNKNOWN120264Substation-AdjacentFLOrange County230 kV300 MW3.7 yrs65.8
PIEDMONTSubstation-AdjacentFLOrange County230 kV300 MW3.7 yrs65.8

Who owns the transmission lines at DEADEND167104?

The 1 connected line listed above is owned by DUKE ENERGY FLORIDA, LLC. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 3.2 miles.

How do candidate sites near DEADEND167104 score?

The 8 highest-scoring candidate sites within about 25 miles range from 66 to 67 on the 0–100 DC Readiness scale. They fall in Orange County, Orange. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is DEADEND167104 substation?

DEADEND167104 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so DEADEND167104 is at the national midpoint.

How many transmission lines connect to DEADEND167104 substation?

1 transmission line terminate at or pass through DEADEND167104 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 3.2 miles.

Who owns DEADEND167104 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at DEADEND167104 belong to DUKE ENERGY FLORIDA, LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is DEADEND167104 substation located?

DEADEND167104 is in Florida at 28.9114, -81.2919. The datacenter candidate sites closest to it are in Orange County, Orange.

Are there datacenter candidate sites near DEADEND167104 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of DEADEND167104. The highest-scoring is UNKNOWN120236 at 67/100. Across Florida, the average DC Readiness score is 56.

More in Florida

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “DEADEND167104 substation, Florida”, https://gridcensus.com/substations/florida/deadend167104-db5654f4 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for DEADEND167104 substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.