DEADEND167081

Substation

Florida · GULF POWER CO

Max voltage
115
kV

At a glance

DEADEND167081 is a 115 kV electric substation in Florida on GULF POWER CO's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is DESTIN in Okaloosa County, with a DC Readiness score of 61/100.

DEADEND167081 is an electric transmission substation in Florida, on GULF POWER CO's transmission network. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership

Line owner (most lines)GULF POWER CO
StateFlorida
Coordinates30.4489, -86.1088

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#109196115 kVGULF POWER CO—0.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEADEND167081, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEADEND167081 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DESTINSubstation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs60.6
UNKNOWN120949Substation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs60.0
NICEVILLESubstation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs59.9
UNKNOWN108173Substation-AdjacentFLBay County230 kV300 MW3.7 yrs59.9
LAGUNA BEACHSubstation-AdjacentFLBay County230 kV300 MW3.7 yrs59.8
HENDERSON PARKSubstation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs59.7
EC Near Portland (FL)GreenfieldFLWalton——3.7 yrs59.7
UNKNOWN120893Substation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs59.6

Who owns the transmission lines at DEADEND167081?

The 1 connected line listed above is owned by GULF POWER CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 0.9 miles.

How do candidate sites near DEADEND167081 score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 61 on the 0–100 DC Readiness scale. They fall in Okaloosa County, Bay County, Walton. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is DEADEND167081 substation?

DEADEND167081 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so DEADEND167081 is at the national midpoint.

How many transmission lines connect to DEADEND167081 substation?

1 transmission line terminate at or pass through DEADEND167081 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 0.9 miles.

Who owns DEADEND167081 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at DEADEND167081 belong to GULF POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is DEADEND167081 substation located?

DEADEND167081 is in Florida at 30.4489, -86.1088. The datacenter candidate sites closest to it are in Okaloosa County, Bay County, Walton.

Are there datacenter candidate sites near DEADEND167081 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of DEADEND167081. The highest-scoring is DESTIN at 61/100. Across Florida, the average DC Readiness score is 56.

More in Florida

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “DEADEND167081 substation, Florida”, https://gridcensus.com/substations/florida/deadend167081-41285734 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for DEADEND167081 substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.