ARCH CREEK
SubstationFlorida
At a glance
ARCH CREEK is an electric transmission substation in Florida. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
No owner is recorded for the lines that connect here.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #125661 | 138 kV | — | IN SERVICE | 3.6 mi |
| #145314 | 138 kV | — | IN SERVICE | 5.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of ARCH CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CONSERVATION | Substation-Adjacent | FL | Broward County | 500 kV | 1,000 MW | 3.7 yrs | 70.9 |
| LEVEE | Substation-Adjacent | FL | Miami-Dade County | 500 kV | 1,000 MW | 3.7 yrs | 70.8 |
| ANDYTOWN | Substation-Adjacent | FL | Broward County | 500 kV | 1,000 MW | 3.7 yrs | 68.8 |
| UNKNOWN108426 | Substation-Adjacent | FL | Broward County | 230 kV | 300 MW | 3.7 yrs | 68.5 |
| TAP150931 | Substation-Adjacent | FL | Broward County | 230 kV | 300 MW | 3.7 yrs | 68.5 |
| UNKNOWN120065 | Substation-Adjacent | FL | Miami-Dade County | 230 kV | 300 MW | 3.7 yrs | 67.6 |
| TAP169166 | Substation-Adjacent | FL | Miami-Dade County | 230 kV | 300 MW | 3.7 yrs | 67.6 |
| MIAMI SHORES | Substation-Adjacent | FL | Miami-Dade County | 230 kV | 300 MW | 3.7 yrs | 67.6 |
How does ARCH CREEK compare with other substations in Florida?
Florida has 2,533 substation records in HIFLD, of which 943 carry a station name; the rest are unnamed tap points, risers and line ends. 359 named substations in the state are in ARCH CREEK's 115–229 kV band (38% of named stations). 269 sit in a higher band. 15 named substations in Florida operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.
How do candidate sites near ARCH CREEK score?
The 8 highest-scoring candidate sites within about 25 miles range from 68 to 71 on the 0–100 DC Readiness scale. They fall in Broward County, Miami-Dade County. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is ARCH CREEK substation?
ARCH CREEK has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so ARCH CREEK is above the national midpoint.
How many transmission lines connect to ARCH CREEK substation?
2 transmission lines terminate at or pass through ARCH CREEK in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 9.5 miles.
Where is ARCH CREEK substation located?
ARCH CREEK is in Florida at 25.8928, -80.1701. The datacenter candidate sites closest to it are in Broward County, Miami-Dade County.
Are there datacenter candidate sites near ARCH CREEK substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of ARCH CREEK. The highest-scoring is CONSERVATION at 71/100. Across Florida, the average DC Readiness score is 56.
Other 138 kV substations in Florida
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “ARCH CREEK substation, Florida”, https://gridcensus.com/substations/florida/arch-creek-56ee0168 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for ARCH CREEK substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.