TAP208121

Substation

Colorado · BLACK HILLS/COLORADO ELEC.UTIL

Max voltage
46
kV

At a glance

TAP208121 is a 46 kV electric substation in Colorado on BLACK HILLS/COLORADO ELEC.UTIL's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is MIDWAY in El Paso County, with a DC Readiness score of 64/100.

TAP208121 is an electric transmission substation in Colorado, on BLACK HILLS/COLORADO ELEC.UTIL's transmission network. It is classified as distribution (<69 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage46 kV
Min voltage46 kV
Voltage classDistribution (<69 kV)
Connected lines1

Ownership

Line owner (most lines)BLACK HILLS/COLORADO ELEC.UTIL
Coordinates38.3669, -104.9942

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20980346 kVBLACK HILLS/COLORADO ELEC.UTIL—4.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208121, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208121 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIDWAYSubstation-AdjacentCOEl Paso County345 kV600 MW4.3 yrs63.8
UNKNOWN201277Substation-AdjacentCOEl Paso County230 kV300 MW3.5 yrs62.3
UNKNOWN202852Substation-AdjacentCOEl Paso County115 kV100 MW3.5 yrs59.5
EC Near South Plant (CO)GreenfieldCOEl Paso——4.3 yrs59.4
PUEBLOSubstation-AdjacentCOPueblo County230 kV300 MW3.5 yrs59.1
EC Near Pueblo Airport Generating StationGreenfieldCOPueblo——3.5 yrs58.8
NIXONSubstation-AdjacentCOEl Paso County115 kV100 MW3.5 yrs58.4
UNKNOWN202854Substation-AdjacentCOEl Paso County115 kV100 MW3.5 yrs58.3

Who owns the transmission lines at TAP208121?

The 1 connected line listed above is owned by BLACK HILLS/COLORADO ELEC.UTIL. Line voltages range from 46 kV to 46 kV. Their combined recorded length is about 4.6 miles.

How do candidate sites near TAP208121 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 64 on the 0–100 DC Readiness scale. They fall in El Paso County, El Paso, Pueblo County, Pueblo. The Colorado average across 3,428 scored sites is 50.6. 899 of those Colorado sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP208121 substation?

TAP208121 has a maximum voltage of 46 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so TAP208121 is below the national midpoint.

How many transmission lines connect to TAP208121 substation?

1 transmission line terminate at or pass through TAP208121 in the HIFLD line data. The connected lines listed here run at 46 kV. Together the listed lines cover about 4.6 miles.

Who owns TAP208121 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP208121 belong to BLACK HILLS/COLORADO ELEC.UTIL. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP208121 substation located?

TAP208121 is in Colorado at 38.3669, -104.9942. The datacenter candidate sites closest to it are in El Paso County, El Paso, Pueblo County.

Are there datacenter candidate sites near TAP208121 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP208121. The highest-scoring is MIDWAY at 64/100. Across Colorado, the average DC Readiness score is 50.6.

More in Colorado

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP208121 substation, Colorado”, https://gridcensus.com/substations/colorado/tap208121-c6b6755b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP208121 substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.