Skip to content
Gridcensus

CURECANTI

Substation

Colorado · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
230
kV

At a glance

CURECANTI is a 230 kV electric substation in Colorado on WAPA-- WESTERN AREA POWER ADMINISTRATION's transmission network, recorded in the HIFLD transmission dataset. 8 transmission lines connect to it. 20 of Colorado's 400 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is OZ Montrose in Montrose, with a DC Readiness score of 58/100.

CURECANTI is an electric transmission substation in Colorado, on WAPA-- WESTERN AREA POWER ADMINISTRATION's transmission network. It is classified as high-voltage (230 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines8

Ownership

Coordinates38.4294, -107.5356

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#201692230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION—81.1 mi
#201751230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION—94.3 mi
#201791230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION—83.0 mi
#206037230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION—1.9 mi
#206515138 kVDELTA MONTROSE ELECTRIC ASSN—11.2 mi
#212126138 kVDELTA MONTROSE ELECTRIC ASSN—0.3 mi
#201780115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION—14.5 mi
#201781115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION—12.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CURECANTI, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CURECANTI substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ MontroseGreenfieldCOMontrose——4.3 yrs58.3
EC Coal Delta CountyGreenfieldCODelta County——4.3 yrs58.2
UNKNOWN202204Substation-AdjacentCOOuray County230 kV300 MW4.3 yrs57.7
CURECANTISubstation-AdjacentCOOuray County230 kV300 MW4.3 yrs57.6
EC Coal Ouray CountyGreenfieldCOOuray County——4.3 yrs57.3
EC Coal Montrose CountyGreenfieldCOMontrose County——4.3 yrs56.7
HOTCHKISSSubstation-AdjacentCODelta County138 kV100 MW4.3 yrs55.8
UNKNOWN203749Substation-AdjacentCODelta County115 kV100 MW4.3 yrs55.3

How does CURECANTI compare with other substations in Colorado?

Colorado has 1,214 substation records in HIFLD, of which 400 carry a station name; the rest are unnamed tap points, risers and line ends. 128 named substations in the state are in CURECANTI's 230–344 kV band (32% of named stations). 20 sit in a higher band. 20 named substations in Colorado operate at 345 kV or above. The highest voltage recorded in the state is 345 kV, and the state median is 115 kV.

Who owns the transmission lines at CURECANTI?

The 8 connected lines listed above are owned by WAPA-- WESTERN AREA POWER ADMINISTRATION, DELTA MONTROSE ELECTRIC ASSN. Line voltages range from 115 kV to 230 kV. Their combined recorded length is about 298.3 miles.

How do candidate sites near CURECANTI score?

The 8 highest-scoring candidate sites within about 25 miles range from 55 to 58 on the 0–100 DC Readiness scale. They fall in Montrose, Delta County, Ouray County, Montrose County. The Colorado average across 3,428 scored sites is 50.6. 899 of those Colorado sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is CURECANTI substation?

CURECANTI has a maximum voltage of 230 kV and a minimum of 115 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so CURECANTI is above the national midpoint.

How many transmission lines connect to CURECANTI substation?

8 transmission lines terminate at or pass through CURECANTI in the HIFLD line data. The connected lines listed here run at 230 kV, 138 kV, 115 kV. Together the listed lines cover about 298.3 miles.

Who owns CURECANTI substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at CURECANTI belong to WAPA-- WESTERN AREA POWER ADMINISTRATION, and others to DELTA MONTROSE ELECTRIC ASSN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is CURECANTI substation located?

CURECANTI is in Colorado at 38.4294, -107.5356. The datacenter candidate sites closest to it are in Montrose, Delta County, Ouray County.

Are there datacenter candidate sites near CURECANTI substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of CURECANTI. The highest-scoring is OZ Montrose at 58/100. Across Colorado, the average DC Readiness score is 50.6.

Other 230 kV substations in Colorado

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “CURECANTI substation, Colorado”, https://gridcensus.com/substations/colorado/curecanti-d3d545b0 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for CURECANTI substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.