TAP307889

Substation

California · AZUSA LIGHT & POWER

Max voltage
115
kV

At a glance

TAP307889 is a 115 kV electric substation in California on AZUSA LIGHT & POWER's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is SAN BERNARDINO in Orange County, with a DC Readiness score of 60/100.

TAP307889 is an electric transmission substation in California, on AZUSA LIGHT & POWER's transmission network. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership

Line owner (most lines)AZUSA LIGHT & POWER
Coordinates34.3083, -117.3246

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#300517115 kVAZUSA LIGHT & POWERIN SERVICE0.3 mi
#313345115 kVAZUSA LIGHT & POWERIN SERVICE0.1 mi
#313811115 kVSOUTERN CALIFORNIA EDISONIN SERVICE7.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP307889, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP307889 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SAN BERNARDINOSubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs60.2
MIRA LOMASubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs59.2
LINDESubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs58.9
RANCHO VISTASubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs58.8
LUGOSubstation-AdjacentCALos Angeles County500 kV1,000 MW7.6 yrs57.6
VICTORVILLESubstation-AdjacentCALos Angeles County500 kV1,000 MW7.6 yrs57.6
VICTORVILLESubstation-AdjacentCALos Angeles County500 kV1,000 MW7.6 yrs57.6
ADELANTOSubstation-AdjacentCALos Angeles County500 kV1,000 MW7.6 yrs57.4

Who owns the transmission lines at TAP307889?

The 3 connected lines listed above are owned by AZUSA LIGHT & POWER, SOUTERN CALIFORNIA EDISON. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 7.8 miles.

How do candidate sites near TAP307889 score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 60 on the 0–100 DC Readiness scale. They fall in Orange County, Los Angeles County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP307889 substation?

TAP307889 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP307889 is at the national midpoint.

How many transmission lines connect to TAP307889 substation?

2 transmission lines terminate at or pass through TAP307889 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 7.8 miles.

Who owns TAP307889 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP307889 belong to AZUSA LIGHT & POWER, and others to SOUTERN CALIFORNIA EDISON. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP307889 substation located?

TAP307889 is in California at 34.3083, -117.3246. The datacenter candidate sites closest to it are in Orange County, Los Angeles County.

Are there datacenter candidate sites near TAP307889 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP307889. The highest-scoring is SAN BERNARDINO at 60/100. Across California, the average DC Readiness score is 45.4.

More in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP307889 substation, California”, https://gridcensus.com/substations/california/tap307889-e2569174 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP307889 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.