Skip to content
Gridcensus

TAP302651

Substation

California · PACIFICORP

Max voltage
230
kV

At a glance

TAP302651 is a 230 kV electric substation in California on PACIFICORP's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is HILLTOP in Modoc County, with a DC Readiness score of 53/100.

TAP302651 is an electric transmission substation in California, on PACIFICORP's transmission network. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership

Line owner (most lines)PACIFICORP
Coordinates41.5344, -120.9448

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#307169230 kVPACIFICORPIN SERVICE44.2 mi
#311404230 kVPACIFICORP—7.9 mi
#312525230 kVPACIFICORPIN SERVICE16.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302651, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302651 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HILLTOPSubstation-AdjacentCAModoc County345 kV600 MW7.6 yrs52.7
TAP310737Substation-AdjacentCAModoc County230 kV300 MW7.6 yrs51.1
TAP302651Substation-AdjacentCAModoc County230 kV300 MW7.6 yrs50.9
HILLTOP TAPSubstation-AdjacentCAModoc County230 kV300 MW7.6 yrs50.7
TAP302449Substation-AdjacentCAModoc County69 kV50 MW7.6 yrs44.7
ADINSubstation-AdjacentCAModoc County69 kV50 MW7.6 yrs44.7
Greenfield (ALTRUS - None)GreenfieldCAModoc County230 kV300 MW7.6 yrs44.7
CLEAR LAKESubstation-AdjacentCAModoc County69 kV50 MW7.6 yrs44.6

Who owns the transmission lines at TAP302651?

The 3 connected lines listed above are owned by PACIFICORP. Line voltages range from 230 kV to 230 kV. Their combined recorded length is about 68.4 miles.

How do candidate sites near TAP302651 score?

The 8 highest-scoring candidate sites within about 25 miles range from 45 to 53 on the 0–100 DC Readiness scale. They fall in Modoc County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP302651 substation?

TAP302651 has a maximum voltage of 230 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so TAP302651 is above the national midpoint.

How many transmission lines connect to TAP302651 substation?

3 transmission lines terminate at or pass through TAP302651 in the HIFLD line data. The connected lines listed here run at 230 kV. Together the listed lines cover about 68.4 miles.

Who owns TAP302651 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP302651 belong to PACIFICORP. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP302651 substation located?

TAP302651 is in California at 41.5344, -120.9448. The datacenter candidate sites closest to it are in Modoc County.

Are there datacenter candidate sites near TAP302651 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP302651. The highest-scoring is HILLTOP at 53/100. Across California, the average DC Readiness score is 45.4.

More in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP302651 substation, California”, https://gridcensus.com/substations/california/tap302651-c2ec3f09 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP302651 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.