GATES is an electric transmission substation in California. It is classified as extra-high-voltage (500 kv) and connects 15 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage60 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines15

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.1423, -120.1288

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GATES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GATES substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Gates PeakerBrownfieldCAKings County66 kV47 MW5.7 yrs50.9
GATESSubstation-AdjacentCAKings County500 kV1,000 MW8.2 yrs50.0
UNKNOWN307522Substation-AdjacentCAFresno County230 kV300 MW8.2 yrs47.6
EC Near Gates PeakerGreenfieldCAFresno5.7 yrs47.2
EC Near Gates PeakerGreenfieldCAFresno5.7 yrs46.8
EC Near Gates PeakerGreenfieldCAFresno5.7 yrs46.6
EC Near Gates PeakerGreenfieldCAFresno5.7 yrs46.3
EC Near Helms Energy CenterGreenfieldCAFresno5.7 yrs46.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.