At a glance

DEADEND308956 is a 66 kV electric substation in California on AZUSA LIGHT & POWER's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is VALLEY in Orange County, with a DC Readiness score of 62/100.

DEADEND308956 is an electric transmission substation in California, on AZUSA LIGHT & POWER's transmission network. It is classified as distribution (<69 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage66 kV
Min voltage66 kV
Voltage classDistribution (<69 kV)
Connected lines1

Ownership

Line owner (most lines)AZUSA LIGHT & POWER
Coordinates34.0482, -117.4799

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30807366 kVAZUSA LIGHT & POWER—0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEADEND308956, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEADEND308956 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
VALLEYSubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs62.3
INLAND EMPIRESubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs62.3
SERRANOSubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs60.8
SAN BERNARDINOSubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs60.2
MIRA LOMASubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs59.2
Anaheim GTBrownfieldCAOrange County66 kV49 MW7.6 yrs59.0
LINDESubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs58.9
RANCHO VISTASubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs58.8

Who owns the transmission lines at DEADEND308956?

The 1 connected line listed above is owned by AZUSA LIGHT & POWER. Line voltages range from 66 kV to 66 kV. Their combined recorded length is about 0.5 miles.

How do candidate sites near DEADEND308956 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 62 on the 0–100 DC Readiness scale. They fall in Orange County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is DEADEND308956 substation?

DEADEND308956 has a maximum voltage of 66 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so DEADEND308956 is below the national midpoint.

How many transmission lines connect to DEADEND308956 substation?

1 transmission line terminate at or pass through DEADEND308956 in the HIFLD line data. The connected lines listed here run at 66 kV. Together the listed lines cover about 0.5 miles.

Who owns DEADEND308956 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at DEADEND308956 belong to AZUSA LIGHT & POWER. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is DEADEND308956 substation located?

DEADEND308956 is in California at 34.0482, -117.4799. The datacenter candidate sites closest to it are in Orange County.

Are there datacenter candidate sites near DEADEND308956 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of DEADEND308956. The highest-scoring is VALLEY at 62/100. Across California, the average DC Readiness score is 45.4.

More in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “DEADEND308956 substation, California”, https://gridcensus.com/substations/california/deadend308956-2b892076 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for DEADEND308956 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.