At a glance

CALISTOGA 199 is a 230 kV electric substation in California, recorded in the HIFLD transmission dataset. 0 transmission lines connect to it. 44 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is OAKMONT SOUTH in Napa County, with a DC Readiness score of 55/100.

CALISTOGA 199 is an electric transmission substation in California. It is classified as high-voltage (230 kv) and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines0

Ownership

No owner is recorded for the lines that connect here.

Coordinates38.7897, -122.7445

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CALISTOGA 199, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CALISTOGA 199 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OAKMONT SOUTHSubstation-AdjacentCANapa County230 kV300 MW7.6 yrs55.0
OAKMONT NORTHSubstation-AdjacentCANapa County230 kV300 MW7.6 yrs54.9
FULTONSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs54.3
SOCRATES 19Substation-AdjacentCASonoma County230 kV300 MW7.6 yrs53.3
WEST FORD FLATSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs52.9
BEAR CANYONSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs52.6
QUICKSILVERSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs51.9
BIG GEYSERSSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs51.9

How does CALISTOGA 199 compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 384 named substations in the state are in CALISTOGA 199's 230–344 kV band (13% of named stations). 44 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

How do candidate sites near CALISTOGA 199 score?

The 8 highest-scoring candidate sites within about 25 miles range from 52 to 55 on the 0–100 DC Readiness scale. They fall in Napa County, Sonoma County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is CALISTOGA 199 substation?

CALISTOGA 199 has a maximum voltage of 230 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so CALISTOGA 199 is above the national midpoint.

How many transmission lines connect to CALISTOGA 199 substation?

0 transmission lines terminate at or pass through CALISTOGA 199 in the HIFLD line data.

Where is CALISTOGA 199 substation located?

CALISTOGA 199 is in California at 38.7897, -122.7445. The datacenter candidate sites closest to it are in Napa County, Sonoma County.

Are there datacenter candidate sites near CALISTOGA 199 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of CALISTOGA 199. The highest-scoring is OAKMONT SOUTH at 55/100. Across California, the average DC Readiness score is 45.4.

Other 230 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “CALISTOGA 199 substation, California”, https://gridcensus.com/substations/california/calistoga-199-7023173b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for CALISTOGA 199 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.