DatacenteractiveMemphis, TN · xAI
xAI Macrohardrr is an operating datacenter facility in Memphis, TN, operated by xAI.. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- EdgeConneX Memphis (EDCMEM01)Memphis, TN · 6 networks
- DataBank Memphis (MEM1)Memphis, TN · 5 networks
- Expedient MemphisMemphis, TN · 2 networks
- Level(3) MemphisMemphis, TN · 2 networks
Other datacenters nearby
- xAI Macrohard Colossus 2xAI · Memphis, TN
- xAI MacrohardrrxAI · Memphis, MS
- xAI ColossusxAI · Memphis, TN
- EdgeConneX Memphis (EDCMEM01)EdgeConneX Inc. · Memphis, TN
- xAI ColossusxAI · Memphis, TN
Nearby datacenter candidate sites
Scored candidate sites near xAI Macrohardrr, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| FREEPORT | Substation-Adjacent | MS | DeSoto County | 500 kV | 1,000 MW | 1.4 yrs | 78.6 |
| BROWNSVILLE | Substation-Adjacent | TN | Shelby County | 500 kV | 1,000 MW | 1.4 yrs | 78.1 |
| CORDOVA | Substation-Adjacent | TN | Shelby County | 500 kV | 1,000 MW | 1.4 yrs | 77.6 |
| Allen | Brownfield | TN | Shelby | — | 990 MW | — | 76.6 |
| SOUTHAVEN | Substation-Adjacent | MS | DeSoto County | 500 kV | 1,000 MW | 1.4 yrs | 75.9 |
| SHELBY | Substation-Adjacent | TN | Tipton County | 500 kV | 1,000 MW | 1.4 yrs | 75.5 |
| HORN LAKE | Substation-Adjacent | MS | DeSoto County | 230 kV | 300 MW | 1.4 yrs | 74.3 |
| Greenfield (FREEPORT - CORDOVA) | Greenfield | TN | Shelby County | 500 kV | 1,000 MW | 1.4 yrs | 73.9 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for xAI Macrohardrr, Memphis, TN. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.